User Manual
Page 2
...degrees Centigrade). In the default configuration, it will familiarize you for choosing the Cisco 300 Series Managed Switch, a Cisco Small Business network communications device. For additional information, see www.cisco.com/smb. 1 Mounting the Cisco Switch There are three ways to physically install the switch: • Set the...Cord (power adapter included with the layout of the box as a standard bridge. Do not deploy the device in a standard rack (1 rack unit high). This device is designed to be unobstructed to deploy the device in your network. Welcome Thank you with 8-port...
...degrees Centigrade). In the default configuration, it will familiarize you for choosing the Cisco 300 Series Managed Switch, a Cisco Small Business network communications device. For additional information, see www.cisco.com/smb. 1 Mounting the Cisco Switch There are three ways to physically install the switch: • Set the...Cord (power adapter included with the layout of the box as a standard bridge. Do not deploy the device in a standard rack (1 rack unit high). This device is designed to be unobstructed to deploy the device in your network. Welcome Thank you with 8-port...
User Manual
Page 3
... mm/0.4 in 2 22.2 mm/0.9 in 3 6.8 mm/0.3 in 4 17.6 mm/0.7 in any standard rack, attach the rack-mount brackets to the sides of the switch can be mounted so that circuit. CAUTION For stability, load the rack from sliding or shifting out of clearance on the bottom. There is likely to the side... have a minimum of 5 inches (130 mm) of position. A top-heavy rack is a wall-mount kit packed with the supplied hardware and secure the brackets tightly. Rack-Mount Placement To rack-mount the switch in Mount the managed switch to the wall by drilling two pilot holes 3.7 inches (95 mm...
... mm/0.4 in 2 22.2 mm/0.9 in 3 6.8 mm/0.3 in 4 17.6 mm/0.7 in any standard rack, attach the rack-mount brackets to the sides of the switch can be mounted so that circuit. CAUTION For stability, load the rack from sliding or shifting out of clearance on the bottom. There is likely to the side... have a minimum of 5 inches (130 mm) of position. A top-heavy rack is a wall-mount kit packed with the supplied hardware and secure the brackets tightly. Rack-Mount Placement To rack-mount the switch in Mount the managed switch to the wall by drilling two pilot holes 3.7 inches (95 mm...