Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 3
...;C. • The system is not for use in electrical shock. The likelihood of batteries or battery packs. - The upstream circuit breaker must be performed or supervised by personnel knowledgeable about batteries and the required precautions. - It should be observed: - When replacing batteries, replace with the same type and number of such shock can be easily accessible...
...;C. • The system is not for use in electrical shock. The likelihood of batteries or battery packs. - The upstream circuit breaker must be performed or supervised by personnel knowledgeable about batteries and the required precautions. - It should be observed: - When replacing batteries, replace with the same type and number of such shock can be easily accessible...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 4
...SAFETY INSTRUCTIONS Special precautions • The unit is imperative to use the same type and number of element as the original Battery Module provided with the UPS to maintain an identical level of performance and safety. Page 4 9PX3K3U_EN keep the unit horizontal ...don't use vacuum lifter preferentially for a normal storage temperature less than 25°C). This charges the battery, thus avoiding possible irreversible damage. • During the replacement of the Battery Module, it at least once every 6 months (for handling operations. • All handling operations ...
...SAFETY INSTRUCTIONS Special precautions • The unit is imperative to use the same type and number of element as the original Battery Module provided with the UPS to maintain an identical level of performance and safety. Page 4 9PX3K3U_EN keep the unit horizontal ...don't use vacuum lifter preferentially for a normal storage temperature less than 25°C). This charges the battery, thus avoiding possible irreversible damage. • During the replacement of the Battery Module, it at least once every 6 months (for handling operations. • All handling operations ...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 5
... 29 6.1 Communication ports 29 6.2 Eaton Intelligent Power Software suite 32 7. 9PX3K3U_EN Contents 1. Specifications 41 9.1 Model specifications...41 10. Power cables connection 24 4.1 Access to replace batteries 33 7.4 Replacing batteries...34 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM 37 7.6 Recycling the used equipment 37 8. Glossary 45 Page 5 ENGLISH Installation 16 3.1 Inspecting the equipment...
... 29 6.1 Communication ports 29 6.2 Eaton Intelligent Power Software suite 32 7. 9PX3K3U_EN Contents 1. Specifications 41 9.1 Model specifications...41 10. Power cables connection 24 4.1 Access to replace batteries 33 7.4 Replacing batteries...34 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM 37 7.6 Recycling the used equipment 37 8. Glossary 45 Page 5 ENGLISH Installation 16 3.1 Inspecting the equipment...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 33
... the frequency of usage and ambient temperature. Contact your service representative. 7.3 When to replace batteries When the battery replacement screen is displayed, it is recommended to replace the batteries. If the UPS requires any type of 25°C (77°F). The internal batteries charge to keep units running at an ambient temperature of transportation, verify that the...
... the frequency of usage and ambient temperature. Contact your service representative. 7.3 When to replace batteries When the battery replacement screen is displayed, it is recommended to replace the batteries. If the UPS requires any type of 25°C (77°F). The internal batteries charge to keep units running at an ambient temperature of transportation, verify that the...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 34
... grounds are removed during installation and maintenance (applicable to order new batteries. • Proper disposal of a grounded battery can be extremely toxic. • Determine if the battery is inadvertently grounded. Wear rubber gloves and boots. • When replacing batteries, replace with insulated handles, 3. Batteries may be replaced easily without turning off the UPS or disconnecting the load. Refer...
... grounds are removed during installation and maintenance (applicable to order new batteries. • Proper disposal of a grounded battery can be extremely toxic. • Determine if the battery is inadvertently grounded. Wear rubber gloves and boots. • When replacing batteries, replace with insulated handles, 3. Batteries may be replaced easily without turning off the UPS or disconnecting the load. Refer...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 35
..." on the cable or disconnect it. 4. Remove the center cover of the front panel 3. Verify that the replacement batteries have the same rating as the batteries being replaced. 6. ENGLISH 7. UPS maintenance • Replacing the internal battery The internal battery is heavy. Screw back the metal protection cover and the front panel, then clip the center cover. 8. Push...
..." on the cable or disconnect it. 4. Remove the center cover of the front panel 3. Verify that the replacement batteries have the same rating as the batteries being replaced. 6. ENGLISH 7. UPS maintenance • Replacing the internal battery The internal battery is heavy. Screw back the metal protection cover and the front panel, then clip the center cover. 8. Push...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 36
... and will not harm personnel. Verify that adequate bend radius and strain relief exist for proper disposal. Charge the batteries for 25 seconds. Page 36 9PX3K3U_EN To replace the EBM(s): 1. Lifting the cabinet into a rack requires a minimum of arcing may be connected to activate the... menu options. 3. Replace the EBM(s). Select Control then Start battery test. Press any button to the UPS. 4. During the battery test, the UPS transfers to the connector of the UPS and of the test completed. A...
... and will not harm personnel. Verify that adequate bend radius and strain relief exist for proper disposal. Charge the batteries for 25 seconds. Page 36 9PX3K3U_EN To replace the EBM(s): 1. Lifting the cabinet into a rack requires a minimum of arcing may be connected to activate the... menu options. 3. Replace the EBM(s). Select Control then Start battery test. Press any button to the UPS. 4. During the battery test, the UPS transfers to the connector of the UPS and of the test completed. A...
Eaton 9PX3K3U and 9PX EBM 180 V Installation and User Manual
Page 37
... the trash. For proper disposal, contact your local codes for disposal requirements. • Do not open or mutilate the battery or batteries. UPS maintenance 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM. Press the button to Bypass. 2. Clip back the center cover of the PPDM ... disposal of the used equipment. • Do not dispose of properly. To remove the UPS: 1. For more information about this accessory. • Replacing the UPS equipped with a HotSwap MBP. Check that the UPS is in a fire. Remove the center cover of the PPDM front panel. 7. Press...
... the trash. For proper disposal, contact your local codes for disposal requirements. • Do not open or mutilate the battery or batteries. UPS maintenance 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM. Press the button to Bypass. 2. Clip back the center cover of the PPDM ... disposal of the used equipment. • Do not dispose of properly. To remove the UPS: 1. For more information about this accessory. • Replacing the UPS equipped with a HotSwap MBP. Check that the UPS is in a fire. Remove the center cover of the PPDM front panel. 7. Press...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 3
...;C. • The system is not for use in the indicated order. • CAUTION - When replacing batteries, replace with the same type and number of batteries. - Batteries constitute a danger (electrical shock, burns). The likelihood of such shock can be properly grounded. • The...The system must be energized even if the systems is inadvertently grounded. Disconnect charging source prior to connecting or disconnecting battery terminals. - Determine if battery is disconnected from ground. To avoid accidents, the directives listed below must be observed: - Servicing of heat...
...;C. • The system is not for use in the indicated order. • CAUTION - When replacing batteries, replace with the same type and number of batteries. - Batteries constitute a danger (electrical shock, burns). The likelihood of such shock can be properly grounded. • The...The system must be energized even if the systems is inadvertently grounded. Disconnect charging source prior to connecting or disconnecting battery terminals. - Determine if battery is disconnected from ground. To avoid accidents, the directives listed below must be observed: - Servicing of heat...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 4
... avoiding possible irreversible damage. • During the replacement of the Battery Module, it at low height - Page 4 5-6kVA US_EN There are provided only for unpacking manually the unit from the straps during unpacking. • Before and ... carry the unit around. SAFETY INSTRUCTIONS Special precautions • The unit is imperative to use the same type and number of element as the original Battery Module provided with the UPS to maintain an identical level of performance and safety. keep the unit horizontal during handling (risk of injury and product...
... avoiding possible irreversible damage. • During the replacement of the Battery Module, it at low height - Page 4 5-6kVA US_EN There are provided only for unpacking manually the unit from the straps during unpacking. • Before and ... carry the unit around. SAFETY INSTRUCTIONS Special precautions • The unit is imperative to use the same type and number of element as the original Battery Module provided with the UPS to maintain an identical level of performance and safety. keep the unit horizontal during handling (risk of injury and product...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 5
Power cables connection 24 4.1 Access to replace batteries 33 7.4 Replacing batteries...34 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM 37 7.6 Recycling the used equipment 37 8. Troubleshooting 38 8.1 Typical alarms... and shutdown 25 5.2 Operating modes...26 5.3 Transferring the UPS between modes 26 5.4 Setting High Efficiency mode 27 5.5 Configuring Bypass settings 27 5.6 Configuring battery settings 27 5.7 Retrieving the Event log 28 5.8 Retrieving the Fault log 28 6. Specifications 41 9.1 Model specifications...41 10. Communication 29 6.1 Communication ports...
Power cables connection 24 4.1 Access to replace batteries 33 7.4 Replacing batteries...34 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM 37 7.6 Recycling the used equipment 37 8. Troubleshooting 38 8.1 Typical alarms... and shutdown 25 5.2 Operating modes...26 5.3 Transferring the UPS between modes 26 5.4 Setting High Efficiency mode 27 5.5 Configuring Bypass settings 27 5.6 Configuring battery settings 27 5.7 Retrieving the Event log 28 5.8 Retrieving the Fault log 28 6. Specifications 41 9.1 Model specifications...41 10. Communication 29 6.1 Communication ports...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 33
...and turned off and then disconnect the UPS internal battery connector (see on page 35). Contact your service representative. 7.3 When to replace batteries When the battery replacement screen is displayed, it is recommended to order new batteries. BaLtotaedrynroetpplaocweemreendt 4-% years bat1te0r0y% ! UPS maintenance 7.1 ...Storing the equipment If you store the equipment for a long period, recharge the battery every 6 months by connecting the UPS to 90% capacity in less than 3 hours. Replace batteries at least every 4 years to keep units running at an ambient temperature of...
...and turned off and then disconnect the UPS internal battery connector (see on page 35). Contact your service representative. 7.3 When to replace batteries When the battery replacement screen is displayed, it is recommended to order new batteries. BaLtotaedrynroetpplaocweemreendt 4-% years bat1te0r0y% ! UPS maintenance 7.1 ...Storing the equipment If you store the equipment for a long period, recharge the battery every 6 months by connecting the UPS to 90% capacity in less than 3 hours. Replace batteries at least every 4 years to keep units running at an ambient temperature of...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 34
.... Refer to your service representative to flame. • Do not open or mutilate the battery or batteries. The likelihood of batteries is in a fire. Wear rubber gloves and boots. • When replacing batteries, replace with insulated handles, 3. Contact with any battery wiring or connectors. Batteries can result in electrical shock. Remove watches, rings, or other metal objects, 2. Attempting...
.... Refer to your service representative to flame. • Do not open or mutilate the battery or batteries. The likelihood of batteries is in a fire. Wear rubber gloves and boots. • When replacing batteries, replace with insulated handles, 3. Contact with any battery wiring or connectors. Batteries can result in electrical shock. Remove watches, rings, or other metal objects, 2. Attempting...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 35
... front panel, then clip the center cover. 8. Pull out the plastic handle of the front panel 2. Continue to a flat and stable surface. Verify that the replacement batteries have the same rating as the batteries being replaced. 6. Remove the center cover of the battery pack, and slide the pack out slowly on to "Testing new...
... front panel, then clip the center cover. 8. Pull out the plastic handle of the front panel 2. Continue to a flat and stable surface. Verify that the replacement batteries have the same rating as the batteries being replaced. 6. Remove the center cover of the battery pack, and slide the pack out slowly on to "Testing new...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 36
...bypass voltage is in progress" and the percentage of two people. Lifting the cabinet into the battery connector(s). To replace the EBM(s): 1. Unplug the EBM power cable and battery detection cable from each cable. 5. Verify that the EBM connections are tight and that adequate ...the menu options. 3. This is heavy. Connect the battery detection cable(s) to the UPS. Select Control then Start battery test. A small amount of the EBM(s). • Testing new batteries To test new batteries: 1. UPS maintenance • Replacing the EBM(s) The EBM is normal and will not harm...
...bypass voltage is in progress" and the percentage of two people. Lifting the cabinet into the battery connector(s). To replace the EBM(s): 1. Unplug the EBM power cable and battery detection cable from each cable. 5. Verify that the EBM connections are tight and that adequate ...the menu options. 3. This is heavy. Connect the battery detection cable(s) to the UPS. Select Control then Start battery test. A small amount of the EBM(s). • Testing new batteries To test new batteries: 1. UPS maintenance • Replacing the EBM(s) The EBM is normal and will not harm...
Eaton 9PX 5000 9PX 6000 9PX 6000 G 9PX EMB 180 V Installation and User Manual
Page 37
... and can now be disconnected. Turn the PPDM switch to activate the menu options. Batteries may be On). 5. For more information about this accessory. • Replacing the UPS equipped with a HotSwap MBP. UPS maintenance 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM. Select Control then Go...the UPS. 6. Press the button to the HotSwap MBP. 2. This product contains sealed, lead acid batteries and must be On). 5. Turn the HotSwap MBP switch to service or replace the UPS without interrupting the connected loads. Check that the UPS is in Online mode: the load is...
... and can now be disconnected. Turn the PPDM switch to activate the menu options. Batteries may be On). 5. For more information about this accessory. • Replacing the UPS equipped with a HotSwap MBP. UPS maintenance 7.5 Replacing the UPS equipped with a HotSwap MBP or with a PPDM. Select Control then Go...the UPS. 6. Press the button to the HotSwap MBP. 2. This product contains sealed, lead acid batteries and must be On). 5. Turn the HotSwap MBP switch to service or replace the UPS without interrupting the connected loads. Check that the UPS is in Online mode: the load is...
Product Datasheet
Page 2
EBM requires 2 Replacement Battery Cartridges. NOM (Mexico) FCC Part 15 Class A (USA); ENERGY STAR Qualified; All Rights Reserved. CE (Europe); Eaton is a registered trademark.... years 5Parts, electronics and UPS batteries coverage24x7 on-site labor coverage, next-day responseNext-day shippingTechnical support © 2022 Eaton. EN 62040-2; 1000 Eaton Boulevard Cleveland, OH 44122 United States BATTERY Battery Type Expandable Runtime DC System Voltage (VDC) Internal UPS Replacement Battery Cartridge Battery Replacement Description Battery Management Valve Regulated Lead Acid (...
EBM requires 2 Replacement Battery Cartridges. NOM (Mexico) FCC Part 15 Class A (USA); ENERGY STAR Qualified; All Rights Reserved. CE (Europe); Eaton is a registered trademark.... years 5Parts, electronics and UPS batteries coverage24x7 on-site labor coverage, next-day responseNext-day shippingTechnical support © 2022 Eaton. EN 62040-2; 1000 Eaton Boulevard Cleveland, OH 44122 United States BATTERY Battery Type Expandable Runtime DC System Voltage (VDC) Internal UPS Replacement Battery Cartridge Battery Replacement Description Battery Management Valve Regulated Lead Acid (...