Installation Instructions
Page 2
... ends or closed loop connectors and marked for use gasoline or other appliance. - NEMA 10-30R NEMA 14-30R GAS Laundry Center CIRCUIT - Ratchet with clothes dryers. cold, 10 psi). NOTE: The electrical service to the laundry center must conform with local codes and ordinances and...POWER SUPPLY -3 wire, 120 volt single phase, 60 Hz, Alternating Current. Flat or straight blade screwdriven 5. Rigid or flexible metal 4 inch (10.16 cm) duct. 7. The faucets MUST be 3/4 inch (1.9 cm) garden hose type so inlet hoses can advise you cannot reach your building. POWER SUPPLY...
... ends or closed loop connectors and marked for use gasoline or other appliance. - NEMA 10-30R NEMA 14-30R GAS Laundry Center CIRCUIT - Ratchet with clothes dryers. cold, 10 psi). NOTE: The electrical service to the laundry center must conform with local codes and ordinances and...POWER SUPPLY -3 wire, 120 volt single phase, 60 Hz, Alternating Current. Flat or straight blade screwdriven 5. Rigid or flexible metal 4 inch (10.16 cm) duct. 7. The faucets MUST be 3/4 inch (1.9 cm) garden hose type so inlet hoses can advise you cannot reach your building. POWER SUPPLY...
Installation Instructions
Page 3
... installing laundry center dryer duct. 0 56 ft. (17.07 m) 42 ft. (12.8 m) 1 46 ft. (14.02 m) 36 ft. (10.97 m) 2 34 ft. (10.36 m) 28 ft. (8.53 m) 3 32 ft. (9.75 rn) 18 ft. (5.48 m) MAXIMUM LENGTH OF 4-INCH (10.2 CM) DIAMETER FLEXIBLE METAL DUCT 0 30 ft. (9.14 m) 22 ft. (6.7 m) 1 22 ft. (6.7 rn) 14 ft. (4.27 rn) 2 16 ft. (4.88 m) 10 ft. (3.05 m) 3 10 ft. (3.05 m) 5 ft. (1.5 m) The laundry...
... installing laundry center dryer duct. 0 56 ft. (17.07 m) 42 ft. (12.8 m) 1 46 ft. (14.02 m) 36 ft. (10.97 m) 2 34 ft. (10.36 m) 28 ft. (8.53 m) 3 32 ft. (9.75 rn) 18 ft. (5.48 m) MAXIMUM LENGTH OF 4-INCH (10.2 CM) DIAMETER FLEXIBLE METAL DUCT 0 30 ft. (9.14 m) 22 ft. (6.7 m) 1 22 ft. (6.7 rn) 14 ft. (4.27 rn) 2 16 ft. (4.88 m) 10 ft. (3.05 m) 3 10 ft. (3.05 m) 5 ft. (1.5 m) The laundry...
Installation Instructions
Page 4
... codes, with equivalent air openings for test gage connection, MUST be installed immediately upstream of the gas supply connection to or less than 1/2 psig (3.45 kPa). 7.The dryer MUSTbe isolated from the gas supply piping system during any pressure testing of stainless steel or plastic-coated brass. 4. A 1/8... be unobstructed when a door is required. If codes allow, flexible metal tubing may be constructed of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.45 kPa). 16 I (104.77 CM) 29 7116 IN ._,_ (REAR) (74.77 CM) \J 3%1N. _:---(9.52...
... codes, with equivalent air openings for test gage connection, MUST be installed immediately upstream of the gas supply connection to or less than 1/2 psig (3.45 kPa). 7.The dryer MUSTbe isolated from the gas supply piping system during any pressure testing of stainless steel or plastic-coated brass. 4. A 1/8... be unobstructed when a door is required. If codes allow, flexible metal tubing may be constructed of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.45 kPa). 16 I (104.77 CM) 29 7116 IN ._,_ (REAR) (74.77 CM) \J 3%1N. _:---(9.52...
Installation Instructions
Page 5
...tub blocking pad, shipping bolt, and plastic spacer block should be 4 inches (10.16 cm) in diameter with 3/8 inch (0.96 cm) socket, remove the mechanism shipping bolt and plastic spacer block from dryer door. (d) foam dryer support pads. (e) inlet hoses. (f) enclosure package. 5. Remove: (a) foam tub ...PLASTIC SPACER MECHANL € SHIPPING BOLT FOAM SHIPPING PAD CARTON CORNER POSTS POWER CORD (IF EQUIPPED) DRAIN HOSE ii i 4.When installing a gas dryer into a mobile home, a provision must be retained. 3. In Canada, the CSA Z240 is applicable. _1__ The laundry center is enclosed, ...
...tub blocking pad, shipping bolt, and plastic spacer block should be 4 inches (10.16 cm) in diameter with 3/8 inch (0.96 cm) socket, remove the mechanism shipping bolt and plastic spacer block from dryer door. (d) foam dryer support pads. (e) inlet hoses. (f) enclosure package. 5. Remove: (a) foam tub ...PLASTIC SPACER MECHANL € SHIPPING BOLT FOAM SHIPPING PAD CARTON CORNER POSTS POWER CORD (IF EQUIPPED) DRAIN HOSE ii i 4.When installing a gas dryer into a mobile home, a provision must be retained. 3. In Canada, the CSA Z240 is applicable. _1__ The laundry center is enclosed, ...
Installation Instructions
Page 8
...Verify proper operation after the laundry center is necessary for service. 16. WATER WILL SYPHON FROM THE WASHER IF THE ABOVE INSTRUCTIONS ARE NOT FOLLOWED. 10. Connect the exhaust duct to the dryer cabinet. Also see thatnothing (such as a routine with a cable... causing suffocation. Good safe practice and caution MUST be bled of combustion and ventilation air. 13. 8. Run the washer and dryer though a cycle. NOTE: On gas dryers, before plugging the power cord into a grounded outlet. Destroy the carton, plastic bags, and metal band after servicing. Form ...
...Verify proper operation after the laundry center is necessary for service. 16. WATER WILL SYPHON FROM THE WASHER IF THE ABOVE INSTRUCTIONS ARE NOT FOLLOWED. 10. Connect the exhaust duct to the dryer cabinet. Also see thatnothing (such as a routine with a cable... causing suffocation. Good safe practice and caution MUST be bled of combustion and ventilation air. 13. 8. Run the washer and dryer though a cycle. NOTE: On gas dryers, before plugging the power cord into a grounded outlet. Destroy the carton, plastic bags, and metal band after servicing. Form ...