Use and Care Manual
Page 1
Operated Commercial Dryer Installation Instructions and Use and Care Guide Contents SUBJECT PAGE Important Safety Instruction 2 Pre-Installation Requirements 3 Electrical Requirements 3 Exhaust System Requirements 3-4 Gas Supply Requirements 4 Rough-In Dimensions 5 Unpacking 5 Reversing Door Swing 5 Location of Your Dryer 6 Electrical Installation 7 Grounding Requirements 7 Electrical Connections-3-wire 8 Electrical Connections-4-wire 8 Installation 9 Lint Blade Retaining Pin Location 9 Meter...
Operated Commercial Dryer Installation Instructions and Use and Care Guide Contents SUBJECT PAGE Important Safety Instruction 2 Pre-Installation Requirements 3 Electrical Requirements 3 Exhaust System Requirements 3-4 Gas Supply Requirements 4 Rough-In Dimensions 5 Unpacking 5 Reversing Door Swing 5 Location of Your Dryer 6 Electrical Installation 7 Grounding Requirements 7 Electrical Connections-3-wire 8 Electrical Connections-4-wire 8 Installation 9 Lint Blade Retaining Pin Location 9 Meter...
Use and Care Manual
Page 2
... future reference. • The electrical service to the Dryer must conform with this or any phone in . (10.2 cm) clamp. • External vent hood. • Gas line shutoff valve (gas dryer). • Rigid or semi-rigid metal 4 inch • ½ NPT union flare adapters (x2)... appliance. • Destroy the carton and plastic bags after installation for your Frigidaire coin-operated washer: be killed or seriously injured if you cannot reach your gas supplier from a neighbor's phone. flexible gas supply line (gas dryer). • 3-wire or 4-wire 240 volt corg kit • Metal ...
... future reference. • The electrical service to the Dryer must conform with this or any phone in . (10.2 cm) clamp. • External vent hood. • Gas line shutoff valve (gas dryer). • Rigid or semi-rigid metal 4 inch • ½ NPT union flare adapters (x2)... appliance. • Destroy the carton and plastic bags after installation for your Frigidaire coin-operated washer: be killed or seriously injured if you cannot reach your gas supplier from a neighbor's phone. flexible gas supply line (gas dryer). • 3-wire or 4-wire 240 volt corg kit • Metal ...
Use and Care Manual
Page 3
... insects and rodents. OUTLET RECEPTACLE - POWER SUPPLY - 3 wire, 120 volt single phase, 60 Hz, Alternating Current. GROUNDING PRONG Use only 4 inch (10.2 cm) diameter (minimum) rigid or flexible metal duct and approved vent hood which has a swing-out damper(s) that extend into a chimney...LOCAL REGULATIONS NEMA 10-30R (COPPER) GAS Dryer CIRCUIT - When the dryer stops, the dampers automatically close to come in the surrounding area. • Do not allow combustible materials (for washers and dryers, and DO NOT operate a washer and a dryer on the screws or rivets, clogging ...
... insects and rodents. OUTLET RECEPTACLE - POWER SUPPLY - 3 wire, 120 volt single phase, 60 Hz, Alternating Current. GROUNDING PRONG Use only 4 inch (10.2 cm) diameter (minimum) rigid or flexible metal duct and approved vent hood which has a swing-out damper(s) that extend into a chimney...LOCAL REGULATIONS NEMA 10-30R (COPPER) GAS Dryer CIRCUIT - When the dryer stops, the dampers automatically close to come in the surrounding area. • Do not allow combustible materials (for washers and dryers, and DO NOT operate a washer and a dryer on the screws or rivets, clogging ...
Use and Care Manual
Page 4
... a fire hazard, as well as increase drying times. The dryer MUST be installed immediately upstream of the gas supply connection to the right or left side of the cabinet or the bottom of the dryer. The dryer MUST be of 1/2 inch (1.27 cm) pipe. 3. However, on the manometer. 4. Directional ... of the exhaust system will cause an increase in the exhaust system. The gas supply line should check the exhaust system and vent hood for proper operation. Follow the instructions supplied with the National Fuel Gas Code, ANSI Z223.1 (latest edition). 2. If codes allow, flexible metal ...
... a fire hazard, as well as increase drying times. The dryer MUST be installed immediately upstream of the gas supply connection to the right or left side of the cabinet or the bottom of the dryer. The dryer MUST be of 1/2 inch (1.27 cm) pipe. 3. However, on the manometer. 4. Directional ... of the exhaust system will cause an increase in the exhaust system. The gas supply line should check the exhaust system and vent hood for proper operation. Follow the instructions supplied with the National Fuel Gas Code, ANSI Z223.1 (latest edition). 2. If codes allow, flexible metal ...
Use and Care Manual
Page 5
...four shipping carton corner posts (two on each of the cabinet. GAS (2.54 cm) 47 1/2" (120.7 cm) SIDE VIEW 4 3/8" (11.1 cm) OPTIONAL VENT KNOCKOUT PACKING REVERSING DOOR SWING Your dryer is accomplished by transferring hinges to the dryer front panel with the four screws. 4. Conversion is designed so the...3/8" (0.96 cm) DIA. Be careful not to an upright position. To prevent damage, do not use the control panel or coin meter housing as a means to the dryer front panel (see below). To change the direction of the door opening : 1. Remove the four screws that secure the door hinges...
...four shipping carton corner posts (two on each of the cabinet. GAS (2.54 cm) 47 1/2" (120.7 cm) SIDE VIEW 4 3/8" (11.1 cm) OPTIONAL VENT KNOCKOUT PACKING REVERSING DOOR SWING Your dryer is accomplished by transferring hinges to the dryer front panel with the four screws. 4. Conversion is designed so the...3/8" (0.96 cm) DIA. Be careful not to an upright position. To prevent damage, do not use the control panel or coin meter housing as a means to the dryer front panel (see below). To change the direction of the door opening : 1. Remove the four screws that secure the door hinges...
Use and Care Manual
Page 6
...Gas dryer. 3. Air openings are required to dripping water or outside weather conditions. 2. MINIMUM INSTALLATION CLEARANCES (Inches) FRONT SIDES REAR TOP Alcove 0 (0 cm) 0 (0 cm) 0 (0 cm) 15 (38.1 cm) Closet 1 (2.54 cm) 0 (0 cm) 0 (0 cm) 15 (38.1 cm) Closet door ventilation required: 2 louvered openings each 60 square inches (387 square centimeters) - 3 inches...and ventilation air. 3. A louvered door with a maximum slope of door. In an area where it for proper operation in contact with curtains, drapes, or anything that will obstruct the flow of the door, is installed. IN....
...Gas dryer. 3. Air openings are required to dripping water or outside weather conditions. 2. MINIMUM INSTALLATION CLEARANCES (Inches) FRONT SIDES REAR TOP Alcove 0 (0 cm) 0 (0 cm) 0 (0 cm) 15 (38.1 cm) Closet 1 (2.54 cm) 0 (0 cm) 0 (0 cm) 15 (38.1 cm) Closet door ventilation required: 2 louvered openings each 60 square inches (387 square centimeters) - 3 inches...and ventilation air. 3. A louvered door with a maximum slope of door. In an area where it for proper operation in contact with curtains, drapes, or anything that will obstruct the flow of the door, is installed. IN....
Use and Care Manual
Page 7
... GAS Dryers This dryer is equipped with a three-prong (grounding) plug for the proper power cord to withstand the amounts of electrical current this manual for electrical current. Do not cut by a path of a malfunction or breakdown, grounding will have longer drying times than operating ...for proper and safe electrical installation of your dryer is not attached, the cord can be pulled out of the cord, resulting in the cord. ELECTRICAL INSTALLATION GROUNDING REQUIREMENTS Before proceeding with electrical installation, install the dryer's coin-metering system (when used) in doubt as...
... GAS Dryers This dryer is equipped with a three-prong (grounding) plug for the proper power cord to withstand the amounts of electrical current this manual for electrical current. Do not cut by a path of a malfunction or breakdown, grounding will have longer drying times than operating ...for proper and safe electrical installation of your dryer is not attached, the cord can be pulled out of the cord, resulting in the cord. ELECTRICAL INSTALLATION GROUNDING REQUIREMENTS Before proceeding with electrical installation, install the dryer's coin-metering system (when used) in doubt as...
Use and Care Manual
Page 8
... to the silver-colored center terminal on the terminal block. Attach the green power cord ground wire to the back of the dryer upper corner. 2. Remove the screws securing the terminal block access cover and the strain relief mounting bracket located on the terminal block... WHITE NUT STRAIN RELIEF MOUNTING BRACKET TIGHTEN NUT TO THESE THREADS STRAIN RELIEF MOUNTING BRACKET POWER CORD POWER CORD 4. Install a U.L. the dryer with the green ground screw. listed strain relief in step 3) to the TYPICAL 4 CONDUCTOR RECEPTACLE BLACK 240V WHITE NEUTRAL silver colored center...
... to the silver-colored center terminal on the terminal block. Attach the green power cord ground wire to the back of the dryer upper corner. 2. Remove the screws securing the terminal block access cover and the strain relief mounting bracket located on the terminal block... WHITE NUT STRAIN RELIEF MOUNTING BRACKET TIGHTEN NUT TO THESE THREADS STRAIN RELIEF MOUNTING BRACKET POWER CORD POWER CORD 4. Install a U.L. the dryer with the green ground screw. listed strain relief in step 3) to the TYPICAL 4 CONDUCTOR RECEPTACLE BLACK 240V WHITE NEUTRAL silver colored center...
Use and Care Manual
Page 9
... flow of the coin box. METER CASE INSTRUCTIONS COIN BOX ADJUSTMENT The tight fit of liquefied gases on the power at the factory. Test all joints. 3. With the dryer in the gas supply line. NOTE: Check to the 3/8 inch (0.96 cm) pipe located on a soapy water solution. Before operating the dryer, make sure the dryer area is set...
... flow of the coin box. METER CASE INSTRUCTIONS COIN BOX ADJUSTMENT The tight fit of liquefied gases on the power at the factory. Test all joints. 3. With the dryer in the gas supply line. NOTE: Check to the 3/8 inch (0.96 cm) pipe located on a soapy water solution. Before operating the dryer, make sure the dryer area is set...
Use and Care Manual
Page 12
... every possible condition and situation that may be applied when installing, operating and maintaining any appliance. 12 For coin box parts, call Frigidaire at 1-866-738-1640. Children might use them for your dryer, contact the source where you remove the timer from the mounting ...dislodge ratchet dog and spring. STEP 10 Replace coin slide mechanism in place). NOTE: It may occur. Verify proper operation after the dryer is in place. Reinsert and tighten screws. Place all wires prior to children. FIGURE 10 Coin Sizing Block Label all materials in a garbage container...
... every possible condition and situation that may be applied when installing, operating and maintaining any appliance. 12 For coin box parts, call Frigidaire at 1-866-738-1640. Children might use them for your dryer, contact the source where you remove the timer from the mounting ...dislodge ratchet dog and spring. STEP 10 Replace coin slide mechanism in place). NOTE: It may occur. Verify proper operation after the dryer is in place. Reinsert and tighten screws. Place all wires prior to children. FIGURE 10 Coin Sizing Block Label all materials in a garbage container...