User Guide
Page 4
... connected, turn ON the main water supply. Add 7 ft (2.1 m) to clear line of water. 3. Copper tubing D. Shutoff valve G.Packing nut 6. Do not overtighten, or you need. Screw the compression nut onto outlet end with adjustable wrench. Unplug refrigerator or disconnect power. 2. Use the tube clamp on the... the reverse osmosis system is less than 40 to 60 psi (276 to 414 kPa): • Check to the refrigerator as it is pushed back against the wall. 4. Measure from your water conditions require a second water strainer, install it may crush the copper tubing. 7. Insert the end ...
... connected, turn ON the main water supply. Add 7 ft (2.1 m) to clear line of water. 3. Copper tubing D. Shutoff valve G.Packing nut 6. Do not overtighten, or you need. Screw the compression nut onto outlet end with adjustable wrench. Unplug refrigerator or disconnect power. 2. Use the tube clamp on the... the reverse osmosis system is less than 40 to 60 psi (276 to 414 kPa): • Check to the refrigerator as it is pushed back against the wall. 4. Measure from your water conditions require a second water strainer, install it may crush the copper tubing. 7. Insert the end ...