User Manual
Page 23
... present between L1 and L2 at the power receptacle. Tighten the screws. 3. Then, secure the cover with a hold-down screw. Tighten the strain relief screws. 5. Review the "Electrical requirements" section on page 17. 3-wire system D A B C L2 L1 E A. Center silver-colored terminal block screw D. Insert the terminal block cover into the rear...
... present between L1 and L2 at the power receptacle. Tighten the screws. 3. Then, secure the cover with a hold-down screw. Tighten the strain relief screws. 5. Review the "Electrical requirements" section on page 17. 3-wire system D A B C L2 L1 E A. Center silver-colored terminal block screw D. Insert the terminal block cover into the rear...
User Manual
Page 24
..., it may not dry properly. Tighten the screws. 5. CAUTION Before Installing the Dryer, confirm 240 V is present between L1 and L2 at the power receptacle. Review the "Electrical requirements" section on page 17 if needed. 24 English Untitled-16 24 2020-07-14 3:36:16 To connect the ground wire to...
..., it may not dry properly. Tighten the screws. 5. CAUTION Before Installing the Dryer, confirm 240 V is present between L1 and L2 at the power receptacle. Review the "Electrical requirements" section on page 17 if needed. 24 English Untitled-16 24 2020-07-14 3:36:16 To connect the ground wire to...