User Manual (user Manual) (ver.1.0) (English)
Page 17
...taped. Turn on its final location. If bubbles appear, tighten the connections and recheck. Move your dryer on the gas supply. Review the Exhausting section before you can attach the duct work from your dryer to Step 6 on the dryer. Install the duct work ,...connect the 3/4" (1.9 cm) female thread end of a flexible connector to the action of Teflon the floor. Review the Gas Requirements section, then follow these instructions completely before installing the exhaust system. Remove the pipe thread protective cap. Apply pipe joint ...
...taped. Turn on its final location. If bubbles appear, tighten the connections and recheck. Move your dryer on the gas supply. Review the Exhausting section before you can attach the duct work from your dryer to Step 6 on the dryer. Install the duct work ,...connect the 3/4" (1.9 cm) female thread end of a flexible connector to the action of Teflon the floor. Review the Gas Requirements section, then follow these instructions completely before installing the exhaust system. Remove the pipe thread protective cap. Apply pipe joint ...
User Manual (user Manual) (ver.1.0) (English)
Page 18
... System instructions: a. BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section. Insert the tab of the terminal block cover into your dryer 6. b. e. Review the Electrical Requirements section, then follow the 3 Wire system connection instructions (Step 7) or 4 Wire system instructions (Step 8) below. 7. Connect the ground wire (green or unwrapped...
... System instructions: a. BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section. Insert the tab of the terminal block cover into your dryer 6. b. e. Review the Electrical Requirements section, then follow the 3 Wire system connection instructions (Step 7) or 4 Wire system instructions (Step 8) below. 7. Connect the ground wire (green or unwrapped...