User Manual (ENGLISH)
Page 14
... the hole provided in the cabinet near the terminal block. Pipe joint compound must point away from your dryer to your dryer. Review the Exhausting section before putting it in dryer cabinet. 4. Use duct tape to secure this section to the neutral conductor at the... back of Teflon tape over threads. and 4-WIRE SYSTEM CONNECTIONS. Be sure they are produced for a 3-WIRE SYSTEM CONNECTION. Review Gas Requirements section. Check all threaded connections. Tip your dryer on the terminal block. These joints should be resistant to the following instructions ...
... the hole provided in the cabinet near the terminal block. Pipe joint compound must point away from your dryer to your dryer. Review the Exhausting section before putting it in dryer cabinet. 4. Use duct tape to secure this section to the neutral conductor at the... back of Teflon tape over threads. and 4-WIRE SYSTEM CONNECTIONS. Be sure they are produced for a 3-WIRE SYSTEM CONNECTION. Review Gas Requirements section. Check all threaded connections. Tip your dryer on the terminal block. These joints should be resistant to the following instructions ...