User Manual
Page 1
...M4 x 8 mm socket pin serrated washer head screw R M6 x 16 mm socket pin screw AA connection block A Qty. Installation and Assembly: Optoma Universal Projector Mount By Peerless Model: BM-5001U Max Load Capacity: 50 lb (22.6 kg) This product is intended for use with lock patch F 4 mm security allen...8870 • Fax: (708) 865-2941 • www.peerlessmounts.com ISSUED: 04-20-09 SHEET #: 056-9019-7 09-07-10 NOTE: Before installation review the directory on page 2 to projectors. Parts List Description A main plate B extension bracket C precision gear projector mount D 10-32 x 3/8" ...
...M4 x 8 mm socket pin serrated washer head screw R M6 x 16 mm socket pin screw AA connection block A Qty. Installation and Assembly: Optoma Universal Projector Mount By Peerless Model: BM-5001U Max Load Capacity: 50 lb (22.6 kg) This product is intended for use with lock patch F 4 mm security allen...8870 • Fax: (708) 865-2941 • www.peerlessmounts.com ISSUED: 04-20-09 SHEET #: 056-9019-7 09-07-10 NOTE: Before installation review the directory on page 2 to projectors. Parts List Description A main plate B extension bracket C precision gear projector mount D 10-32 x 3/8" ...
User Manual
Page 3
... OF MOUNT C G H fig. 2.2 Visit the Peerless Web Site at www.peerlessmounts.com 3 of swivel adjustment before fully securing wood screws. Installers are anchored into wood studs. Note: Mounting slots on joist orientation. Drill two 5/32" (4 mm) dia. holes to a minimum depth of... mount through standard thickness drywall or plaster into the center of the stud. Installation To Wood Joist Ceilings WARNING • Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and ...
... OF MOUNT C G H fig. 2.2 Visit the Peerless Web Site at www.peerlessmounts.com 3 of swivel adjustment before fully securing wood screws. Installers are anchored into wood studs. Note: Mounting slots on joist orientation. Drill two 5/32" (4 mm) dia. holes to a minimum depth of... mount through standard thickness drywall or plaster into the center of the stud. Installation To Wood Joist Ceilings WARNING • Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and ...
User Manual
Page 11
.... 3 Slide connection block (AA) with precision gear projector mount (C) as shown. ARROW INDICATES FRONT OF MOUNT FRONT OF MOUNT C AA CAPTIVE SCREW 4 IMPORTANT: For security installations, insert one #10-32 x 1/4" socket pin screw (E) through precision gear projector mount (C) and into connection block (AA) as shown.
.... 3 Slide connection block (AA) with precision gear projector mount (C) as shown. ARROW INDICATES FRONT OF MOUNT FRONT OF MOUNT C AA CAPTIVE SCREW 4 IMPORTANT: For security installations, insert one #10-32 x 1/4" socket pin screw (E) through precision gear projector mount (C) and into connection block (AA) as shown.