Installation Manual
Page 28
... layout - Planning and installing a network backbone The backbone needs to be inserted in the backbone for smaller systems. 28 Wiring | ELITE Ti Installation Manual and be no further than 6 m from a device to run between the locations of the unit. Connect to the ...• Micro-C power cable. Used to connect a drop cable to secure. Ú Note: StructureScan HD, StructureScan 3D and TotalScan transducer installation instructions are included with a NMEA 2000 connector. Device connection The ELITE-7Ti is keyed, and can be plugged directly into the 9 pin port on page 13. ...
... layout - Planning and installing a network backbone The backbone needs to be inserted in the backbone for smaller systems. 28 Wiring | ELITE Ti Installation Manual and be no further than 6 m from a device to run between the locations of the unit. Connect to the ...• Micro-C power cable. Used to connect a drop cable to secure. Ú Note: StructureScan HD, StructureScan 3D and TotalScan transducer installation instructions are included with a NMEA 2000 connector. Device connection The ELITE-7Ti is keyed, and can be plugged directly into the 9 pin port on page 13. ...