"Manufacturer's Certification for Credit" Manual
Page 1
... ELMHURST, IL 60126 Identi cation of Property Solar Electric Property Make and Model Number(s) of Property Qualifying for Credit LiftMaster LA412 Solar Gate Operator System (Single Gate Model LA412-1PKG) LiftMaster LA412 Solar Gate Operator System (Dual Gate Model LA412-2PKG) LiftMaster SW425DCSP3 Solar Gate Operator System LiftMaster RSL12V Residential DC Slide Gate Operator System ( Single gate model RSL12V...
... ELMHURST, IL 60126 Identi cation of Property Solar Electric Property Make and Model Number(s) of Property Qualifying for Credit LiftMaster LA412 Solar Gate Operator System (Single Gate Model LA412-1PKG) LiftMaster LA412 Solar Gate Operator System (Dual Gate Model LA412-2PKG) LiftMaster SW425DCSP3 Solar Gate Operator System LiftMaster RSL12V Residential DC Slide Gate Operator System ( Single gate model RSL12V...
Refer to the solar cycle chart for more details. Manual
Page 1
... heavy fog or heavy rain affect solar panel performance and charge rate. LA412 not supported/available in the given regions. Power is not supported in an open area clear of obstructions and shading for a single or dual gate, daily cycle rate, number of accessories and region of solar panels ... and a reduced number of hours of cold weather on batteries in Zone 4 NUMBER OF CYCLES PER DAY Single Arm Installations NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL 2 PANEL 3 PANEL Arm Only Zone 1 Zone 2 50 40 Accessories Solenoid Lock(SGLOCK12V) 50 35 Loop(LD7LP) 50 31 ...
... heavy fog or heavy rain affect solar panel performance and charge rate. LA412 not supported/available in the given regions. Power is not supported in an open area clear of obstructions and shading for a single or dual gate, daily cycle rate, number of accessories and region of solar panels ... and a reduced number of hours of cold weather on batteries in Zone 4 NUMBER OF CYCLES PER DAY Single Arm Installations NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL 2 PANEL 3 PANEL Arm Only Zone 1 Zone 2 50 40 Accessories Solenoid Lock(SGLOCK12V) 50 35 Loop(LD7LP) 50 31 ...
LA412 Manual
Page 10
INSTALLATION » OVERVIEW OF TYPICAL INSTALLATION DUAL GATE Solar Panel (Facing South) Antenna Warning Sign Hinge Post Bracket Gate Bracket Gate 1 Control Box with Batteries Operator Cable Gate 2 Junction Box Extension Cable ...
INSTALLATION » OVERVIEW OF TYPICAL INSTALLATION DUAL GATE Solar Panel (Facing South) Antenna Warning Sign Hinge Post Bracket Gate Bracket Gate 1 Control Box with Batteries Operator Cable Gate 2 Junction Box Extension Cable ...
LA412 Manual
Page 22
...the lock attached to Gate 1 connections on the control board. If there is preferred that side for example. The following illustration shows a dual gate configuration with the longer travel span (opening) must be connected to it is no appropriate location on that the control box be installed... Gate 1 connector. Connect to open first and close second. WIRING » SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) Occasionally in dual gate installations, one gate or if using a solenoid lock, for the control box, then mount the control box ...
...the lock attached to Gate 1 connections on the control board. If there is preferred that side for example. The following illustration shows a dual gate configuration with the longer travel span (opening) must be connected to it is no appropriate location on that the control box be installed... Gate 1 connector. Connect to open first and close second. WIRING » SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) SET THE LOCK/BIPART DELAY (MODEL LA412-S ONLY) Occasionally in dual gate installations, one gate or if using a solenoid lock, for the control box, then mount the control box ...
LA412 Manual
Page 26
...50 Zone 3 12 10 10 10 28 25 26 26 46 40 44 44 10W SOLAR 20W SOLAR 30W SOLAR NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL Arms Only 2 PANEL Solenoid Lock Loop LM202 Arms Only 3 PANEL Solenoid Lock Loop LM202 Arms Only Solenoid Lock Loop .... Solar panels cannot be required. Local geography and weather conditions may vary from solar chart for installed accessories that draw additional battery power. The LA412 Solar Gate Operator is not supported in areas that reach below -4° F. They are approximations and do not account for areas that experience heavy...
...50 Zone 3 12 10 10 10 28 25 26 26 46 40 44 44 10W SOLAR 20W SOLAR 30W SOLAR NUMBER OF CYCLES PER DAY Dual Arm Installations 1 PANEL Arms Only 2 PANEL Solenoid Lock Loop LM202 Arms Only 3 PANEL Solenoid Lock Loop LM202 Arms Only Solenoid Lock Loop .... Solar panels cannot be required. Local geography and weather conditions may vary from solar chart for installed accessories that draw additional battery power. The LA412 Solar Gate Operator is not supported in areas that reach below -4° F. They are approximations and do not account for areas that experience heavy...
LA412 Manual
Page 31
... close the left operator. SET CLOSE LIMIT LE LIMITS GATE 2 FORCE 8 Press the GATE 1 left operator. DIAGNOSTIC GATE 1 SET CLOSE 9 Press the LEARN LIMITS button. DUAL GATE (LEFT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the SBC to open the left button to close the gate. 30...
... close the left operator. SET CLOSE LIMIT LE LIMITS GATE 2 FORCE 8 Press the GATE 1 left operator. DIAGNOSTIC GATE 1 SET CLOSE 9 Press the LEARN LIMITS button. DUAL GATE (LEFT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the SBC to open the left button to close the gate. 30...
LA412 Manual
Page 32
... left button to close the left operator. If the problem continues, see Troubleshooting section.) Test the limits by pressing the SBC to blink, repeat programming. DUAL GATE (RIGHT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. DIAGNOSTIC GATE 1 9 Press the LEARN LIMITS button. SET OPEN...
... left button to close the left operator. If the problem continues, see Troubleshooting section.) Test the limits by pressing the SBC to blink, repeat programming. DUAL GATE (RIGHT-SIDE PRIMARY OPERATOR) 1 Close the gate. 2 Engage the operator by pressing the RESET button. DIAGNOSTIC GATE 1 9 Press the LEARN LIMITS button. SET OPEN...