Installation Manual
Page 2
...9 Install the Cover 22 ADJUSTMENT 23 Limit and Force Adjustment 23 Obstruction Test 24 PROGRAMMING 25 Remote Controls (Not Provided 25 LiftMaster Internet Gateway (not provided 26 Erase All Codes 26 Erase Limits 26 Constant Pressure Override (CPO 26 Gate Hold Open Feature 26...Drive Train 36 TROUBLESHOOTING 37 Diagnostic Codes 37 Diagnostic Codes Table 38 Control Board LEDs 40 Troubleshooting Chart 41 APPENDIX 44 Step 6 Solar Panel(s 44 SAMS Wiring With Relays Not Energized 48 Dual Gate Settings 48 Limit Setup With a Remote Control 49 WIRING DIAGRAM 50...
...9 Install the Cover 22 ADJUSTMENT 23 Limit and Force Adjustment 23 Obstruction Test 24 PROGRAMMING 25 Remote Controls (Not Provided 25 LiftMaster Internet Gateway (not provided 26 Erase All Codes 26 Erase Limits 26 Constant Pressure Override (CPO 26 Gate Hold Open Feature 26...Drive Train 36 TROUBLESHOOTING 37 Diagnostic Codes 37 Diagnostic Codes Table 38 Control Board LEDs 40 Troubleshooting Chart 41 APPENDIX 44 Step 6 Solar Panel(s 44 SAMS Wiring With Relays Not Energized 48 Dual Gate Settings 48 Limit Setup With a Remote Control 49 WIRING DIAGRAM 50...
Installation Manual
Page 16
... a single wire length. 1. MUST NOT be performed until disconnecting the electrical power (AC l DO NOT install ANY wiring or attempt to Solar Panels section in the area near the operator l ALL electrical connections MUST be cleared and secured, at the fuse box BEFORE proceeding. switch. The... operator can be properly grounded and connected in separate conduits. Never splice two wires for either 120 Vac or 240 Vac or a solar panel (not provided). Operator labeled. Follow the directions according to the operator. Run wire from the operator. MUST be used to change the ...
... a single wire length. 1. MUST NOT be performed until disconnecting the electrical power (AC l DO NOT install ANY wiring or attempt to Solar Panels section in the area near the operator l ALL electrical connections MUST be cleared and secured, at the fuse box BEFORE proceeding. switch. The... operator can be properly grounded and connected in separate conduits. Never splice two wires for either 120 Vac or 240 Vac or a solar panel (not provided). Operator labeled. Follow the directions according to the operator. Run wire from the operator. MUST be used to change the ...
Installation Manual
Page 43
...Expansion board a. Check that Maglock has power (do not power solenoid from control board accessory power terminals). c. Add more solar panels b. TROUBLESHOOTING SYMPTOM Expansion board function not controlling gate. POSSIBLE CAUSES a. Maglock wired incorrectly Solenoid lock not working correctly. ... b. Check operation of Interrupt Loop detector c. Reduce the accessory power draw by using LiftMaster low power accessories c. Relocate the solar panels away from control board accessory power terminals). Reduce the accessory power draw by using...
...Expansion board a. Check that Maglock has power (do not power solenoid from control board accessory power terminals). c. Add more solar panels b. TROUBLESHOOTING SYMPTOM Expansion board function not controlling gate. POSSIBLE CAUSES a. Maglock wired incorrectly Solenoid lock not working correctly. ... b. Check operation of Interrupt Loop detector c. Reduce the accessory power draw by using LiftMaster low power accessories c. Relocate the solar panels away from control board accessory power terminals). Reduce the accessory power draw by using...
Installation Manual
Page 44
The cycles/day ratings are not supported in the given zones as shown on the map below. Solar panels cannot be used with a solar application. APPENDIX Step 6 Solar Panel(s) SOLAR PANELS ARE NOT PROVIDED. Solar Zones Solar panel recommendations are based upon the average solar radiation and the temperature effects on gate construction, installation, and temperature. l A maximum of heavy fog, lake effect...
The cycles/day ratings are not supported in the given zones as shown on the map below. Solar panels cannot be used with a solar application. APPENDIX Step 6 Solar Panel(s) SOLAR PANELS ARE NOT PROVIDED. Solar Zones Solar panel recommendations are based upon the average solar radiation and the temperature effects on gate construction, installation, and temperature. l A maximum of heavy fog, lake effect...
Installation Manual
Page 45
APPENDIX Solar usage guide Typical System Standby Battery Current Consumption (mA) System voltage Main board with no radios programmed One or more LiftMaster® remote controls programmed MyQ® device or wireless dual gate programmed Expansion board Per loop detector LOOPDETLM... photoelectric sensor heaters (models LMRRUL and LMTBUL) is NOT recommended in solar applications. 24V 2.7 mA +1 mA +2.4 mA +11.1 mA +3.8 mA 10W SOLAR PANEL 20W SOLAR PANEL (Two 10W 12V panels in series) 40W SOLAR PANEL (Two 20W 12V panels in series) 60W SOLAR PANEL BATTERY CURRENT DRAW (mA) 5 15 20 40 60 5 15 ...
APPENDIX Solar usage guide Typical System Standby Battery Current Consumption (mA) System voltage Main board with no radios programmed One or more LiftMaster® remote controls programmed MyQ® device or wireless dual gate programmed Expansion board Per loop detector LOOPDETLM... photoelectric sensor heaters (models LMRRUL and LMTBUL) is NOT recommended in solar applications. 24V 2.7 mA +1 mA +2.4 mA +11.1 mA +3.8 mA 10W SOLAR PANEL 20W SOLAR PANEL (Two 10W 12V panels in series) 40W SOLAR PANEL (Two 20W 12V panels in series) 60W SOLAR PANEL BATTERY CURRENT DRAW (mA) 5 15 20 40 60 5 15 ...
Installation Manual
Page 46
... (91.4 m) 200 (61 m) 10 940 (286.5 m) 475 (144.8 m) 315 (96 m) Chart assumes: copper wire, 65°C, 5% drop, 30V nominal Installation Solar panel(s) MUST be mounted using the provided angle bracket facing due south. Mark and drill holes. 2. Below are general instructions for installing the... lower in an area clear of the installation. Secure the solar panel to the mounting surface using the hex bolts, hex nuts and washers provided. 3. The solar panel(s) should be installed facing south. Secure the solar panel to the mounting bracket using lag screws provided. 46 APPENDIX ...
... (91.4 m) 200 (61 m) 10 940 (286.5 m) 475 (144.8 m) 315 (96 m) Chart assumes: copper wire, 65°C, 5% drop, 30V nominal Installation Solar panel(s) MUST be mounted using the provided angle bracket facing due south. Mark and drill holes. 2. Below are general instructions for installing the... lower in an area clear of the installation. Secure the solar panel to the mounting surface using the hex bolts, hex nuts and washers provided. 3. The solar panel(s) should be installed facing south. Secure the solar panel to the mounting bracket using lag screws provided. 46 APPENDIX ...
Installation Manual
Page 47
Wire the Batteries Solar panel applications require the Solar Harness Kit model K94-37236, see Accessories. APPENDIX Wire the solar panels Proceed to the Dual Gate section (if applicable) or proceed to the Adjustment section. 47
Wire the Batteries Solar panel applications require the Solar Harness Kit model K94-37236, see Accessories. APPENDIX Wire the solar panels Proceed to the Dual Gate section (if applicable) or proceed to the Adjustment section. 47
Installation Manual
Page 53
... is to replace or add a solar panel to ensure proper gate operation. Models 29-NP712 (1) and K74-30762 (2) 33AH batteries Upgrade 33 AMP-Hour Battery, 12 Vdc. Posts not included. Model 86LM LiftMaster® internet gateway Internet enabled accessory...Solar panel kit This kit is below -4°F (-20°C). The heater can detect a car as it approaches and will then open the gate. Model MPEL Remote antenna extension kit The remote antenna extension kit allows the antenna to 250 Vac. Two required. ACCESSORIES Miscellaneous Post-mounting plate For post-mounting models CSL24UL...
... is to replace or add a solar panel to ensure proper gate operation. Models 29-NP712 (1) and K74-30762 (2) 33AH batteries Upgrade 33 AMP-Hour Battery, 12 Vdc. Posts not included. Model 86LM LiftMaster® internet gateway Internet enabled accessory...Solar panel kit This kit is below -4°F (-20°C). The heater can detect a car as it approaches and will then open the gate. Model MPEL Remote antenna extension kit The remote antenna extension kit allows the antenna to 250 Vac. Two required. ACCESSORIES Miscellaneous Post-mounting plate For post-mounting models CSL24UL...
CSL24UL Wiring Diagram
Page 1
...RELAYS N.C. Replace APE assembly. 99 Normal Operation No action required WIRING DIAGRAM Model CSL24UL COAXIAL CABLE ANTENNA Control Board DIAGNOSTICS LOOPS CONTROLS Jumper N.C. Maglock (Optional) (not ... Sensor for open or close cycle OR Solar Panels (Optional) 20W minimum - 60W maximum, wired in series Diode 33AH Batteries 10W 12V Solar (Optional) HEATER (Optional) OUTLET HOUSING...power and try to servicing regarding maintenance and required safety testing. Use ONLY LiftMaster approved entrapment protection devices (refer to the accessory page of monitoring Check wireless ...
...RELAYS N.C. Replace APE assembly. 99 Normal Operation No action required WIRING DIAGRAM Model CSL24UL COAXIAL CABLE ANTENNA Control Board DIAGNOSTICS LOOPS CONTROLS Jumper N.C. Maglock (Optional) (not ... Sensor for open or close cycle OR Solar Panels (Optional) 20W minimum - 60W maximum, wired in series Diode 33AH Batteries 10W 12V Solar (Optional) HEATER (Optional) OUTLET HOUSING...power and try to servicing regarding maintenance and required safety testing. Use ONLY LiftMaster approved entrapment protection devices (refer to the accessory page of monitoring Check wireless ...
UL 325-Listed Gate Operators Guide
Page 3
...a 10W solar panel (6 hours sunlight per day (see solar chart for cycles and standby time. Best-in-Class Approx. 43 cycles Solar Performance** per...Solar 114 cycles 147 cycles Yes Yes Yes Yes Yes Yes Monitored Safety Inputs 6 Inputs (Main and (Color Coded) Expansion Board) 3 Inputs (Main Board) 3 Inputs (Main Board) 3 Inputs (Main Board) 3 Inputs (Main Board) ELITE® SERIES DC COMMERCIAL GATE OPERATORS CSW24UL CSL24UL... lbs. For specifications and information on all our products, visit LiftMaster.com/TOTALPAS UL 325 LISTED GATE OPERATOR FEATURE CHART LMGTCTOOSB Diagnostic ...
...a 10W solar panel (6 hours sunlight per day (see solar chart for cycles and standby time. Best-in-Class Approx. 43 cycles Solar Performance** per...Solar 114 cycles 147 cycles Yes Yes Yes Yes Yes Yes Monitored Safety Inputs 6 Inputs (Main and (Color Coded) Expansion Board) 3 Inputs (Main Board) 3 Inputs (Main Board) 3 Inputs (Main Board) 3 Inputs (Main Board) ELITE® SERIES DC COMMERCIAL GATE OPERATORS CSW24UL CSL24UL... lbs. For specifications and information on all our products, visit LiftMaster.com/TOTALPAS UL 325 LISTED GATE OPERATOR FEATURE CHART LMGTCTOOSB Diagnostic ...
UL 325-Listed Gate Operators Guide
Page 4
... RESIDENTIAL/LIGHT COMMERCIAL LINEAR ACTUATOR Our most environments; SOLAR PANEL KIT Uses the sun to Securely Monitor and Control Your Gate Operator from Anywhere with (2) 10W or (2) 20W solar panels. PRODUCT HI BATTERY BACKUP Provides up to 4 ... YS T E M D E L IV E R S POW E R W HE N AND WHERE YOU NEED IT MOST. MONITORED WIRELESS EDGE KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; EL1SS 828LM 210W/220W PRODUCT GUIDE LA500PKGUL 24VDC RESIDENTIAL/LIGHT COMMERCIAL LINEAR ACTUATOR *Wireless kit for high performance...
... RESIDENTIAL/LIGHT COMMERCIAL LINEAR ACTUATOR Our most environments; SOLAR PANEL KIT Uses the sun to Securely Monitor and Control Your Gate Operator from Anywhere with (2) 10W or (2) 20W solar panels. PRODUCT HI BATTERY BACKUP Provides up to 4 ... YS T E M D E L IV E R S POW E R W HE N AND WHERE YOU NEED IT MOST. MONITORED WIRELESS EDGE KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; EL1SS 828LM 210W/220W PRODUCT GUIDE LA500PKGUL 24VDC RESIDENTIAL/LIGHT COMMERCIAL LINEAR ACTUATOR *Wireless kit for high performance...
UL 325-Listed Gate Operators Guide
Page 6
...energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; range: 130 ft.* MONITORED SAFETY ENTRAPMENT EDGES Full line of obstructions. FIRE DEPARTMENT COMPLIANCE ALLOWS GATE TO AUTO-OPEN UPON LOSS OF AC POWER OR BATTERY DEPLETION. SOLAR PANEL KIT Uses the sun to power... the operator with (2) 10W or (2) 20W solar panels. *Wireless kit for up to 400 Cycles or 97 Days of Standby Power MyQ® TECHNOLOGY...
...energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; range: 130 ft.* MONITORED SAFETY ENTRAPMENT EDGES Full line of obstructions. FIRE DEPARTMENT COMPLIANCE ALLOWS GATE TO AUTO-OPEN UPON LOSS OF AC POWER OR BATTERY DEPLETION. SOLAR PANEL KIT Uses the sun to power... the operator with (2) 10W or (2) 20W solar panels. *Wireless kit for up to 400 Cycles or 97 Days of Standby Power MyQ® TECHNOLOGY...
UL 325-Listed Gate Operators Guide
Page 9
MECHANICS --12VDC C ont inuous -Duty Mo to 30W 12V Solar Panels --A cc essor y Power: 24V DC 500mA Out put LA412PKGUL 12VDC SOLAR RESIDENTIAL LINEAR ACTUATOR LA412CONTUL COMMERCIAL-GRADE DESIGN --H ousing: Commer c ia l- S U P P O R T. c o m For More Information on Board SECURITY+ 2.0®... o r Sales Support: 800.282.6225 Technical Support Center: 800.528.2806 To Order: 800.323.2276 © 2018 LiftMaster All Rights Reserved 300 Windsor Drive, Oak Brook, IL 60523 LiftMaster.com UL® and the UL logo are registered trademarks of UL LLC © 2018 All Rights Reserved. © 2018...
MECHANICS --12VDC C ont inuous -Duty Mo to 30W 12V Solar Panels --A cc essor y Power: 24V DC 500mA Out put LA412PKGUL 12VDC SOLAR RESIDENTIAL LINEAR ACTUATOR LA412CONTUL COMMERCIAL-GRADE DESIGN --H ousing: Commer c ia l- S U P P O R T. c o m For More Information on Board SECURITY+ 2.0®... o r Sales Support: 800.282.6225 Technical Support Center: 800.528.2806 To Order: 800.323.2276 © 2018 LiftMaster All Rights Reserved 300 Windsor Drive, Oak Brook, IL 60523 LiftMaster.com UL® and the UL logo are registered trademarks of UL LLC © 2018 All Rights Reserved. © 2018...
UL 325-Listed Gate Operators Guide
Page 10
... KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; sections come in most environments; max. range: 50 ft. EL25 WARRANTY 3 YEARS. max. MONITORED SAFETY ENTRAPMENT EDGES Full line of Standby Power MONITORED RETRO- SOLAR KIT 20W 12V solar panel kit (includes panel, batteries and harness). UL® LISTED GATE...
... KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; sections come in most environments; max. range: 50 ft. EL25 WARRANTY 3 YEARS. max. MONITORED SAFETY ENTRAPMENT EDGES Full line of Standby Power MONITORED RETRO- SOLAR KIT 20W 12V solar panel kit (includes panel, batteries and harness). UL® LISTED GATE...
UL 325-Listed Gate Operators Guide
Page 12
...; connection between a LiftMaster Monitored Resistive Edge and the gate operator; INTERNET GATEWAY Connects MyQ-enabled gate operators to 4 transmitters and 2 resistive edges per transmitter. UL® LISTED GATE OPERATORS WITH MONITORED SAFETY ENTRAPMENT PROTECTION DEVICES. PRODUCT GUIDE RSL12UL 12VDC RESIDENTIAL/LIGHT COMMERCIAL SLIDE GATE OPERATOR SOLAR PANEL 20W 12V solar panel kits (panel, batteries, harness). *Wireless...
...; connection between a LiftMaster Monitored Resistive Edge and the gate operator; INTERNET GATEWAY Connects MyQ-enabled gate operators to 4 transmitters and 2 resistive edges per transmitter. UL® LISTED GATE OPERATORS WITH MONITORED SAFETY ENTRAPMENT PROTECTION DEVICES. PRODUCT GUIDE RSL12UL 12VDC RESIDENTIAL/LIGHT COMMERCIAL SLIDE GATE OPERATOR SOLAR PANEL 20W 12V solar panel kits (panel, batteries, harness). *Wireless...
UL 325-Listed Gate Operators Guide
Page 14
...ENTRAPMENT EDGES Full line of Small, Large and Wraparound Profile Edges that sense obstructions. SOLAR KIT 210W: (2) 10W 12V solar panels; 40W33A: (2) 20W 12V panels, (2) 33Ah batteries and solar harness. WIRELESS COMMERCIAL KEYPAD Provides constant pressure override to stay aligned; max. LMTBUL ...GATE OPERATOR WARRANTY 5 YEARS COMMERCIAL, 7 YEARS RESIDENTIAL. MONITORED WIRELESS EDGE KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; SAFETY ADD-ONS: MONITORED THROUGHBEAM PHOTO EYES Enhanced through-beam now with gate...
...ENTRAPMENT EDGES Full line of Small, Large and Wraparound Profile Edges that sense obstructions. SOLAR KIT 210W: (2) 10W 12V solar panels; 40W33A: (2) 20W 12V panels, (2) 33Ah batteries and solar harness. WIRELESS COMMERCIAL KEYPAD Provides constant pressure override to stay aligned; max. LMTBUL ...GATE OPERATOR WARRANTY 5 YEARS COMMERCIAL, 7 YEARS RESIDENTIAL. MONITORED WIRELESS EDGE KIT Low-energy Bluetooth® connection between a LiftMaster Monitored Resistive Edge and the gate operator; SAFETY ADD-ONS: MONITORED THROUGHBEAM PHOTO EYES Enhanced through-beam now with gate...
UL 325-Listed Gate Operators Guide
Page 38
... and shading for details) HCTDCUL LA500PKGUL LA412PKGUL LA400PKGUL CSW24UL CSL24UL RSW24UL Solar Gate Cycles Per Day Reference Guide RSL24UL LMGTENCTSLGD 4/18 Power is due to the operator. Snow, heavy fog or heavy rain affect solar panel performance and charge rate. SOLAR GATE CYCLES PER DAY REFERENCE GUIDE LiftMaster Solar Gate Operators feature a best-in-class power management...
... and shading for details) HCTDCUL LA500PKGUL LA412PKGUL LA400PKGUL CSW24UL CSL24UL RSW24UL Solar Gate Cycles Per Day Reference Guide RSL24UL LMGTENCTSLGD 4/18 Power is due to the operator. Snow, heavy fog or heavy rain affect solar panel performance and charge rate. SOLAR GATE CYCLES PER DAY REFERENCE GUIDE LiftMaster Solar Gate Operators feature a best-in-class power management...
UL 325-Listed Gate Operators Guide
Page 39
... to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are representative of wired dual-gate installation. If your installation is a wireless dual-gate setup use 24V 20 Solar Panel 40 60 5 20W Solar Panel 15 Note: 20W would be 20 (2) 10W 12V...
... to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) +5.8 Note: If the additional features on the expansion board are representative of wired dual-gate installation. If your installation is a wireless dual-gate setup use 24V 20 Solar Panel 40 60 5 20W Solar Panel 15 Note: 20W would be 20 (2) 10W 12V...
UL 325-Listed Gate Operators Guide
Page 40
... may be unplugged to conserve additional power draw (11mA) LA412PKGUL SINGLE-GATE SOLAR CYCLES PER DAY DUAL-GATE SOLAR CYCLES PER DAY 10W Solar Panel 20W Solar Panel Note: (2) 10W 12V panels in parallel or (1) 20W 12v panel 30W Solar Panel Note: 30W would be plugged in to the expansion board) Current Draw ...draw power and affect the daily cycle rate. Solar optimized or wireless accessories are not used, it may require additional solar panels. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or...
... may be unplugged to conserve additional power draw (11mA) LA412PKGUL SINGLE-GATE SOLAR CYCLES PER DAY DUAL-GATE SOLAR CYCLES PER DAY 10W Solar Panel 20W Solar Panel Note: (2) 10W 12V panels in parallel or (1) 20W 12v panel 30W Solar Panel Note: 30W would be plugged in to the expansion board) Current Draw ...draw power and affect the daily cycle rate. Solar optimized or wireless accessories are not used, it may require additional solar panels. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or...
UL 325-Listed Gate Operators Guide
Page 41
...7Ah (mA) 7Ah battery batteries 33Ah battery 6 41 46 48 25 10W Solar Panel 30 50 34 39 41 33 37 39 26 30 32 100 11 14 16 6 20W Solar Panel Note: (2) 10W 12V panels 25 or (1) 20W panel 30 50 50 50 50 50 50 50 50 50 in parallel 100 ... 28 7 #NUM! 37 35 13 #NUM! Add up to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Current Draw (mA) 4.2 +1.5 +3.9 +18.5 Per loop detector LOOPDETLM (up...
...7Ah (mA) 7Ah battery batteries 33Ah battery 6 41 46 48 25 10W Solar Panel 30 50 34 39 41 33 37 39 26 30 32 100 11 14 16 6 20W Solar Panel Note: (2) 10W 12V panels 25 or (1) 20W panel 30 50 50 50 50 50 50 50 50 50 in parallel 100 ... 28 7 #NUM! 37 35 13 #NUM! Add up to determine total current draw. Control Board Feature Main board with no radios learned One or more LiftMaster® remote controls learned MyQ® device or wireless dual-gate learned Expansion board Current Draw (mA) 4.2 +1.5 +3.9 +18.5 Per loop detector LOOPDETLM (up...