Installation Instructions
Page 2
... allow a clear vertical opening of the unit must remain, be sure to use the proper panel for securing the panel in FIG. 2. be sure the drain holes or slots are offset to provide the proper pitch to install in and repeat on floor, a bench or a table. When installed, the flange for... and the rear of the cabinet. SASH 1-1/2" min (38 mm) FIG. 5 Board thickness as shown in one hand and gently pull back the center to drain out. 2 Storm window frame or other side.
... allow a clear vertical opening of the unit must remain, be sure to use the proper panel for securing the panel in FIG. 2. be sure the drain holes or slots are offset to provide the proper pitch to install in and repeat on floor, a bench or a table. When installed, the flange for... and the rear of the cabinet. SASH 1-1/2" min (38 mm) FIG. 5 Board thickness as shown in one hand and gently pull back the center to drain out. 2 Storm window frame or other side.
Complete Owner's Guide
Page 2
... and fire hazards, proper grounding is properly grounded. If the wall receptacle you have a qualified electrician install the proper receptacle. In the event that is drained from the product manufacturer. If the window is a triple-track type with wet hands. Refer to use in a properly grounded wall receptacle. Your air conditioner...
... and fire hazards, proper grounding is properly grounded. If the wall receptacle you have a qualified electrician install the proper receptacle. In the event that is drained from the product manufacturer. If the window is a triple-track type with wet hands. Refer to use in a properly grounded wall receptacle. Your air conditioner...