Installation Instructions (All Languages)
Page 3
... loop or open-end spade lugs with ranges shall be accessible. 3 & 4 - Remove the factory installed ground screw & plate to Fig.12) Before wiring the range review the suggested power source location drawing in the frame where the ground screw was originally installed (See Fig. 12). 5. Cut and discard the copper ground...
... loop or open-end spade lugs with ranges shall be accessible. 3 & 4 - Remove the factory installed ground screw & plate to Fig.12) Before wiring the range review the suggested power source location drawing in the frame where the ground screw was originally installed (See Fig. 12). 5. Cut and discard the copper ground...
Installation Instructions (All Languages)
Page 4
... . For existing installations ONLY - Grounding Instructions (3-Wire Connections only): A ground strap is connected to the terminal block. follow Steps 1 thru 5 below . 4 - Before wiring the range, review the suggested power source location drawings in Figs. 1, 2 & 3 before moving appliance into final location. Tighten all the adequate clearances and dimensions shown in Fig. 3. IMPORTANT...
... . For existing installations ONLY - Grounding Instructions (3-Wire Connections only): A ground strap is connected to the terminal block. follow Steps 1 thru 5 below . 4 - Before wiring the range, review the suggested power source location drawings in Figs. 1, 2 & 3 before moving appliance into final location. Tighten all the adequate clearances and dimensions shown in Fig. 3. IMPORTANT...