Installation Guide
Page 18
...Module can be completely identical. Note The Switch Fabric Module is installed first functions as the backup. Supervisor Engine 720 with two modular Gigabit interface uplinks and an optional redundant supervisor engine, in slot 6 or slot 8 acts as the primary module. Supervisor ...with PFC3BXL, and MSFC3 - Twelve additional modules for the Cisco 7613 router • Hot-swappable fan assembly, redundant AC-input or DC-input power supplies, and modules • Redundant AC-input or DC-input power entry modules (PEMs) (Cisco 7603 and 7606 routers only) • Backplane that is not ...
...Module can be completely identical. Note The Switch Fabric Module is installed first functions as the backup. Supervisor Engine 720 with two modular Gigabit interface uplinks and an optional redundant supervisor engine, in slot 6 or slot 8 acts as the primary module. Supervisor ...with PFC3BXL, and MSFC3 - Twelve additional modules for the Cisco 7613 router • Hot-swappable fan assembly, redundant AC-input or DC-input power supplies, and modules • Redundant AC-input or DC-input power entry modules (PEMs) (Cisco 7603 and 7606 routers only) • Backplane that is not ...
Installation Guide
Page 19
... Refer to the Cisco 7600 Series Cisco IOS Software Configuration Guide, 12.1E or the Cisco 7600 Series Cisco IOS Software Configuration Guide, 12.2SX for detailed information about the features supported on the Cisco 7600 series routers. • Modular, upgradable feature modules...DC-input, load-sharing power supplies • Support for two redundant AC- or DC-input PEMs (Cisco 7603 and 7606 routers only) • Power management for modules and power supplies • Environmental monitoring of the Cisco 7600 series router. Chapter 1 Product Overview Cisco 7600 Series Routers Features ...
... Refer to the Cisco 7600 Series Cisco IOS Software Configuration Guide, 12.1E or the Cisco 7600 Series Cisco IOS Software Configuration Guide, 12.2SX for detailed information about the features supported on the Cisco 7600 series routers. • Modular, upgradable feature modules...DC-input, load-sharing power supplies • Support for two redundant AC- or DC-input PEMs (Cisco 7603 and 7606 routers only) • Power management for modules and power supplies • Environmental monitoring of the Cisco 7600 series router. Chapter 1 Product Overview Cisco 7600 Series Routers Features ...
Installation Guide
Page 23
Route processor (RP): 1- to 1 GB) • Requires larger power supplies and a high-speed fan tray • QoS port architecture, 10GE ports (Rx/Tx): 8q8t/1p7q8t (CoS) • QoS port architecture, 1GE ports (Rx/Tx): 2q8t/...
Route processor (RP): 1- to 1 GB) • Requires larger power supplies and a high-speed fan tray • QoS port architecture, 10GE ports (Rx/Tx): 8q8t/1p7q8t (CoS) • QoS port architecture, 1GE ports (Rx/Tx): 2q8t/...
Installation Guide
Page 24
... switch fabric • PFC3CXL (high-capacity) and MSFC4 with 512-MB bootflash, 4-MB NVRAM, 4-MB ROMmon, and several DRAM options: - to 1 GB) • Requires larger power supplies and a high-speed fan tray • QoS port architecture, 10GE ports (Rx/Tx): 8q8t/1p7q8t (CoS) • QoS port architecture, 1GE ports (Rx/Tx): 2q8t...
... switch fabric • PFC3CXL (high-capacity) and MSFC4 with 512-MB bootflash, 4-MB NVRAM, 4-MB ROMmon, and several DRAM options: - to 1 GB) • Requires larger power supplies and a high-speed fan tray • QoS port architecture, 10GE ports (Rx/Tx): 8q8t/1p7q8t (CoS) • QoS port architecture, 1GE ports (Rx/Tx): 2q8t...
Installation Guide
Page 25
...) • 2 CompactFlash Type II slots (on front panel) and 2-GB internal CompactFlash (1 GB each for RP and SP) • Requires larger power supplies and a high-speed fan tray • QoS port architecture (Rx/Tx) is configurable with either a 1-Gbps SFP module or a 10/100/1000-... (on front panel) and 2-GB internal CompactFlash (1 GB each for information see http://www.cisco.com/univercd/cc/td/doc/product/core/cis7600/hardware/cis_76xx/remrep.htm #1098824. The WS-SUP720-3BXL requires larger power supplies and high-speed fans; to 4-GB DRAM (default 1 GB) • Switch processor (...
...) • 2 CompactFlash Type II slots (on front panel) and 2-GB internal CompactFlash (1 GB each for RP and SP) • Requires larger power supplies and a high-speed fan tray • QoS port architecture (Rx/Tx) is configurable with either a 1-Gbps SFP module or a 10/100/1000-... (on front panel) and 2-GB internal CompactFlash (1 GB each for information see http://www.cisco.com/univercd/cc/td/doc/product/core/cis7600/hardware/cis_76xx/remrep.htm #1098824. The WS-SUP720-3BXL requires larger power supplies and high-speed fans; to 4-GB DRAM (default 1 GB) • Switch processor (...
Installation Guide
Page 27
... uplink ports 10GE UPLINK 4 5 LINK LINK LINK LEDs 250253 The LEDs on the supervisor engine front panel indicate the status of the supervisor engine, modules, power supplies, and fan assembly. Table 1-3 describes LED operation for the Supervisor Engine 32. Table 1-4 describes LED operation for the Supervisor Engine 720.
... uplink ports 10GE UPLINK 4 5 LINK LINK LINK LEDs 250253 The LEDs on the supervisor engine front panel indicate the status of the supervisor engine, modules, power supplies, and fan assembly. Table 1-3 describes LED operation for the Supervisor Engine 32. Table 1-4 describes LED operation for the Supervisor Engine 720.
Installation Guide
Page 28
...An overtemperature condition has occurred. (A minor threshold has been exceeded during environmental monitoring.) All chassis environmental monitors are installed. Incompatible power supplies are reporting OK. SWITCH LOAD If the system is booting or running diagnostics (normal initialization sequence). LINK Green The port is... detected. 1. Flashing The link is in the slot and goes off when you insert a card. Orange The power supply or power supply fan failed. PWR MGMT1 Orange Green The supervisor engine is bad and has been disabled due to the active supervisor engine....
...An overtemperature condition has occurred. (A minor threshold has been exceeded during environmental monitoring.) All chassis environmental monitors are installed. Incompatible power supplies are reporting OK. SWITCH LOAD If the system is booting or running diagnostics (normal initialization sequence). LINK Green The port is... detected. 1. Flashing The link is in the slot and goes off when you insert a card. Orange The power supply or power supply fan failed. PWR MGMT1 Orange Green The supervisor engine is bad and has been disabled due to the active supervisor engine....
Installation Guide
Page 84
...) FAN OUTPUT OK FAIL INPUT OK connection ESD ground strap FAN OUTPUT OK FAIL o o SELECT STATUS ACTIVE NEXT Power supply 1 INPUT OK SELECT STATUS ACTIVE NEXT Slot Numbers on Cisco 7609 Router and Cisco 7609-S Router WS-X6K-SUP2-2GE STATUSSYSTEMCONSOLPEWR MGRMETSET CONSOLE SUPERVISOR2 CONSOLE PORT MODE PCMCIA EJECT LINK Switch Load 100% 1% PORT...
...) FAN OUTPUT OK FAIL INPUT OK connection ESD ground strap FAN OUTPUT OK FAIL o o SELECT STATUS ACTIVE NEXT Power supply 1 INPUT OK SELECT STATUS ACTIVE NEXT Slot Numbers on Cisco 7609 Router and Cisco 7609-S Router WS-X6K-SUP2-2GE STATUSSYSTEMCONSOLPEWR MGRMETSET CONSOLE SUPERVISOR2 CONSOLE PORT MODE PCMCIA EJECT LINK Switch Load 100% 1% PORT...
Installation Guide
Page 85
...PORT 3 ACTIVE TX CAARLRAIERRM RX RX TX NEXT 13 91093 o o INPUT OK FAN OUTPUT OK FAIL INPUT OK FAN OUTPUT OK FAIL Power supply 1 Power supply 2 (redundant) ESD ground strap connection Caution To prevent ESD damage, handle modules by the carrier edges only. To install a supervisor ...OSM, Catalyst 6000 family module, or SIP in slot 7 and slot 8. Supervisor Engine 720s and Route Switch Processor 720s are installed in the Cisco 7600 series router, perform these steps: Step 1 Choose a slot for the supervisor engine or module. Note Supervisor Engine 2 is installed in ...
...PORT 3 ACTIVE TX CAARLRAIERRM RX RX TX NEXT 13 91093 o o INPUT OK FAN OUTPUT OK FAIL INPUT OK FAN OUTPUT OK FAIL Power supply 1 Power supply 2 (redundant) ESD ground strap connection Caution To prevent ESD damage, handle modules by the carrier edges only. To install a supervisor ...OSM, Catalyst 6000 family module, or SIP in slot 7 and slot 8. Supervisor Engine 720s and Route Switch Processor 720s are installed in the Cisco 7600 series router, perform these steps: Step 1 Choose a slot for the supervisor engine or module. Note Supervisor Engine 2 is installed in ...
Installation Guide
Page 102
... Fan has failed, shutdown in 2 minutes If the blower or the blower control board fails, you start up , but the Power Supply LED is off , ensure that the power switch is operating when you must replace the blower module. Check whether or not the blower is set correctly to see whether... whether or not the blower is operating and that the blower control board edge connector is probably faulty. 2. Cisco 7600 Series Routers Module Guide 4-2 OL-5077-7 Ensure that the power source, power cable, and power supply are on . If the blower is not operating and the Output Fail LED is off , the...
... Fan has failed, shutdown in 2 minutes If the blower or the blower control board fails, you start up , but the Power Supply LED is off , ensure that the power switch is operating when you must replace the blower module. Check whether or not the blower is set correctly to see whether... whether or not the blower is operating and that the blower control board edge connector is probably faulty. 2. Cisco 7600 Series Routers Module Guide 4-2 OL-5077-7 Ensure that the power source, power cable, and power supply are on . If the blower is not operating and the Output Fail LED is off , the...
Installation Guide
Page 103
...If the supervisor Link LED is not seated properly, it means that the power supplies and blower are not seated properly, they will hang the system. 3. Check the seating of -tolerance power condition, the Output Fail LED goes on , indicating that the system software ...has initialized successfully and that there is operational. 5. If the supervisor is a flashing orange, the system has detected a processor hardware failure. supervisor = Route Switch Processor OL-5077-7 Cisco 7600 Series ...
...If the supervisor Link LED is not seated properly, it means that the power supplies and blower are not seated properly, they will hang the system. 3. Check the seating of -tolerance power condition, the Output Fail LED goes on , indicating that the system software ...has initialized successfully and that there is operational. 5. If the supervisor is a flashing orange, the system has detected a processor hardware failure. supervisor = Route Switch Processor OL-5077-7 Cisco 7600 Series ...