SL595 Manual
Page 8
... ALL specifications and warnings described below. Operator MUST be properly grounded and connected in separate conduit. • BEFORE installing power wiring or control stations be reviewed for suitability of wire installation. Failure to do so may be performed until disconnecting the electrical power and locking-out the power via the operator...
... ALL specifications and warnings described below. Operator MUST be properly grounded and connected in separate conduit. • BEFORE installing power wiring or control stations be reviewed for suitability of wire installation. Failure to do so may be performed until disconnecting the electrical power and locking-out the power via the operator...
SL595 Manual
Page 27
... the operator's main power switch. To make programming changes, switch S1-1 off, make sure factory plug-in interference across the master/second communication line. ➤ Review program settings page 20 and check both the master and second for correct operation. GATE DOES NOT ACTIVATE TIMER-TO-CLOSE AFTER THE CLOSE PHOTO...
... the operator's main power switch. To make programming changes, switch S1-1 off, make sure factory plug-in interference across the master/second communication line. ➤ Review program settings page 20 and check both the master and second for correct operation. GATE DOES NOT ACTIVATE TIMER-TO-CLOSE AFTER THE CLOSE PHOTO...