Owner's Manual
Page 18
ENGLISH Operating Manual Battery replacement Pull at bottom to run on AC power when installed. Replace batteries once a year, or before the batteries are optional (for more than a month. Install fresh batteries when the REPLACE BATT warning begins flashing. If batteries are permanently stored in memory, and do not require battery power. All...
ENGLISH Operating Manual Battery replacement Pull at bottom to run on AC power when installed. Replace batteries once a year, or before the batteries are optional (for more than a month. Install fresh batteries when the REPLACE BATT warning begins flashing. If batteries are permanently stored in memory, and do not require battery power. All...
Owner's Manual
Page 19
... power switch at heating & cooling system is on. • Make sure furnace door is closed securely. • Make sure fresh AA alkaline batteries are correctly installed (see page 7). Make sure the temperature is set higher than the Inside temperature. • Wait 5 minutes for the system to respond. 17 69-1760EFS-01...
... power switch at heating & cooling system is on. • Make sure furnace door is closed securely. • Make sure fresh AA alkaline batteries are correctly installed (see page 7). Make sure the temperature is set higher than the Inside temperature. • Wait 5 minutes for the system to respond. 17 69-1760EFS-01...