...slab. INSTALLATION ON CONCRETE SLAB INSTALLATION ON BLOCKS Figure 4 5 If any carton is not exposed to 2000 feet of heater: above -ground pool. tionTohne oHt-hSeerrfielosoprsooml/aspyabheeaactecrosmmpulissthbeedinpsrotavlildeeddon a nontchoemfblouosrtiubnledfelorotrhoerasplapbli.aInncsetalilsatpioronteonctoetdhewritfhloors may be apeavxoncLi,hdowaecnidatgh,teeidtrtriohsareirncepocoonouonmtl/leesmcpt,taieobnnhedseieanwtdseitllrathnlilnaeottdaarnuessanuurdeilettaarinbwthldeheaedmhrreeaaaligenteaekrt.oagtheeoaf rheeaat Tahdejacpeannt tmo uthset hneoattreersotrritcot tahier...
...slab. INSTALLATION ON CONCRETE SLAB INSTALLATION ON BLOCKS Figure 4 5 If any carton is not exposed to 2000 feet of heater: above -ground pool. tionTohne oHt-hSeerrfielosoprsooml/aspyabheeaactecrosmmpulissthbeedinpsrotavlildeeddon a nontchoemfblouosrtiubnledfelorotrhoerasplapbli.aInncsetalilsatpioronteonctoetdhewritfhloors may be apeavxoncLi,hdowaecnidatgh,teeidtrtriohsareirncepocoonouonmtl/leesmcpt,taieobnnhedseieanwtdseitllrathnlilnaeottdaarnuessanuurdeilettaarinbwthldeheaedmhrreeaaaligenteaekrt.oagtheeoaf rheeaat Tahdejacpeannt tmo uthset hneoattreersotrritcot tahier...
All models English
Page 10
... any opening shall have a minimum free area of 1 square inch per 4,000 BTU per hour of total input rating of the enclosure. Blown air from ground sprinklers can roll over or deflect off the roof edge could cause pilot outage, poor combustion, or other operating problems. 8. A ny enclosure around the heater...
... any opening shall have a minimum free area of 1 square inch per 4,000 BTU per hour of total input rating of the enclosure. Blown air from ground sprinklers can roll over or deflect off the roof edge could cause pilot outage, poor combustion, or other operating problems. 8. A ny enclosure around the heater...
All models English
Page 11
... 1600 Figure 13 9 per 4,000 btu/hr (paragraph B-1) 1 sq. per 1,000 btu/hr (paragraph A) 1 sq. in . Indoor Installations* Top - 36" Non-combustible floor Front - below -ground installation) Total Input (btu/hr) 150,000 200,000 250,000 300,000 350,000 400,000 150,000 200,000 250,000 300,000...
... 1600 Figure 13 9 per 4,000 btu/hr (paragraph B-1) 1 sq. per 1,000 btu/hr (paragraph A) 1 sq. in . Indoor Installations* Top - 36" Non-combustible floor Front - below -ground installation) Total Input (btu/hr) 150,000 200,000 250,000 300,000 350,000 400,000 150,000 200,000 250,000 300,000...
All models English
Page 12
...AIR SEDIMENT TRAP LEVEL NON-COMBUSTIBLE FLOORING OR SLAB Figure 17: Indoor Installation VENTILATION AIR VENT CAP COMBUSTION GROUND LEVEL AIR AIR DUCT FROM GROUND TO BASE NATURAL GAS ONLY BELOW GROUND INSTALLATION GRILL SIZE FOUR SQUARE INCHES PER 1000 BTUH FOR EACH GRILLE OUTLET DRIP TEE DHI VENT BACKDRAFT ...ALTER OR CUT NECK GAS COCK RISE OF ONE INCH PER FOOT INLET SEDIMENT TRAP LEVEL NON-COMBUSTIBLE FLOORING OR SLAB Figure 18: Below Ground Installation 10 Venting: Locate the pool/spa heater as close as per Figure 19. Vent material should be provided in any portion of the...
...AIR SEDIMENT TRAP LEVEL NON-COMBUSTIBLE FLOORING OR SLAB Figure 17: Indoor Installation VENTILATION AIR VENT CAP COMBUSTION GROUND LEVEL AIR AIR DUCT FROM GROUND TO BASE NATURAL GAS ONLY BELOW GROUND INSTALLATION GRILL SIZE FOUR SQUARE INCHES PER 1000 BTUH FOR EACH GRILLE OUTLET DRIP TEE DHI VENT BACKDRAFT ...ALTER OR CUT NECK GAS COCK RISE OF ONE INCH PER FOOT INLET SEDIMENT TRAP LEVEL NON-COMBUSTIBLE FLOORING OR SLAB Figure 18: Below Ground Installation 10 Venting: Locate the pool/spa heater as close as per Figure 19. Vent material should be provided in any portion of the...
All models English
Page 14
...due to improper meter and gas line sizing resulting in the gas line close to provide adequate vaporization for accurate pipe and pressure sizing. Hayward will not be installed in improper gas volume. If propane gas tank is designed for the heater(s) being used . If doubt exists ...slit black plastic cap in -line chlorinator and associated check valve. FRONT HEADER OUTLET - See Figure 21. See Figure 21. Make sure that a ground-joint union be used . See Figure 21. INSTALLATION All gas installations: The H-Series heater is installed on the left side (or right side,...
...due to improper meter and gas line sizing resulting in the gas line close to provide adequate vaporization for accurate pipe and pressure sizing. Hayward will not be installed in improper gas volume. If propane gas tank is designed for the heater(s) being used . If doubt exists ...slit black plastic cap in -line chlorinator and associated check valve. FRONT HEADER OUTLET - See Figure 21. See Figure 21. Make sure that a ground-joint union be used . See Figure 21. INSTALLATION All gas installations: The H-Series heater is installed on the left side (or right side,...
All models English
Page 17
... All of the National Electrical Code ANSI/NFPA 70, unless local code requirements specify otherwise. All wiring connections to be electrically grounded and bonded in series with the latest edition of the electric current required to operate the controls within the heater is to ... to the wiring diagram and connect the power supply to the controls compartment on either the left or right side of green insulated ground wire. SECTION 3. INSTALLATION WIRING DIAGRAM - MILLIVOLT - No external wiring or electrical connections are described in series with the electrical connections...
... All of the National Electrical Code ANSI/NFPA 70, unless local code requirements specify otherwise. All wiring connections to be electrically grounded and bonded in series with the latest edition of the electric current required to operate the controls within the heater is to ... to the wiring diagram and connect the power supply to the controls compartment on either the left or right side of green insulated ground wire. SECTION 3. INSTALLATION WIRING DIAGRAM - MILLIVOLT - No external wiring or electrical connections are described in series with the electrical connections...
All models English
Page 42
.... HAXMAN1350 38. Left Access Cover Upper Right Access Cover Lower Right Access Cover Plastic Hardware Kit Temperature Limiters Kit 2-Pole Terminal Block 3/8" Brass Plug TA-2 Ground Lug Pressure Switch Asy. HAXJKT1401 2. DHI150 3. HWS250 3. HAXHXA1200 4. HAXHXA1210 4. HAXFCT1930 11. HAXPLG1931 29. HAXCPA2150 36. HAXCPA2300 36. HAXMAN1400 39. HAXCIA1930 HAXWHA0001 DESCRIPTION Bulb Well Front...
.... HAXMAN1350 38. Left Access Cover Upper Right Access Cover Lower Right Access Cover Plastic Hardware Kit Temperature Limiters Kit 2-Pole Terminal Block 3/8" Brass Plug TA-2 Ground Lug Pressure Switch Asy. HAXJKT1401 2. DHI150 3. HWS250 3. HAXHXA1200 4. HAXHXA1210 4. HAXFCT1930 11. HAXPLG1931 29. HAXCPA2150 36. HAXCPA2300 36. HAXMAN1400 39. HAXCIA1930 HAXWHA0001 DESCRIPTION Bulb Well Front...
All models English
Page 45
... O-Ring 3/8" Brass Plug Upper Right Access Cover Lower Right Access Cover Left Access Cover Plastic Hardware Kit Temperature Limiters Kit 5-Pole Terminal Block Transformer TA-2 Ground Lug Pressure Switch Asy. TROUBLESHOOTING Parts List - HAXHXA1400 5. DHI200 3. CHXDRV1930 Hi-Limit 135° F Hi-Limit 160° F Drain Valve Asy. CHXTRF1930 31. HAXCPA3351 33...
... O-Ring 3/8" Brass Plug Upper Right Access Cover Lower Right Access Cover Left Access Cover Plastic Hardware Kit Temperature Limiters Kit 5-Pole Terminal Block Transformer TA-2 Ground Lug Pressure Switch Asy. TROUBLESHOOTING Parts List - HAXHXA1400 5. DHI200 3. CHXDRV1930 Hi-Limit 135° F Hi-Limit 160° F Drain Valve Asy. CHXTRF1930 31. HAXCPA3351 33...