Models: ABG1001 H100ID1
Page 2
The premium materials and the exacting processes used in pool heater design and manuIDFWXUH :$51,1* Failure to Maintain Proper Water Chemistry May 3UHPDWXUH+HDW([FKDQJHU'DPDJHRU)DLOXUH Cause The heat exchanger in your Hayward pool heater is state of the art in the manufacture of the heat exchanger is made from the highest quality of copper materials.
The premium materials and the exacting processes used in pool heater design and manuIDFWXUH :$51,1* Failure to Maintain Proper Water Chemistry May 3UHPDWXUH+HDW([FKDQJHU'DPDJHRU)DLOXUH Cause The heat exchanger in your Hayward pool heater is state of the art in the manufacture of the heat exchanger is made from the highest quality of copper materials.
Models: ABG1001 H100ID1
Page 4
... The gas supply line must be capped when not connected. After pressure testing, reconnect the gas piping to proper operation of gas valve 0 to 200 feet Iron Pipe 3/8" 1/2" 3/4" Tubing 5/8" 3/4" 7/8" It is necessary. Gas pipe size: Figure 4 Follow local gas codes for both natural and...1/2" 4 inlet pressure at a pressure drop of 05 inch W.C.) Distance from outlet of 1st stage regulator to inlet of 2nd stage regulator 0 to 200 feet Iron Pipe 1/2" Tubing 1/2" LOW PRESSURE PROPANE GAS PIPE SIZING "SECOND STAGE" (Based upon gas pressure of water. 3ODFHD´DOOHQKHDG...
... The gas supply line must be capped when not connected. After pressure testing, reconnect the gas piping to proper operation of gas valve 0 to 200 feet Iron Pipe 3/8" 1/2" 3/4" Tubing 5/8" 3/4" 7/8" It is necessary. Gas pipe size: Figure 4 Follow local gas codes for both natural and...1/2" 4 inlet pressure at a pressure drop of 05 inch W.C.) Distance from outlet of 1st stage regulator to inlet of 2nd stage regulator 0 to 200 feet Iron Pipe 1/2" Tubing 1/2" LOW PRESSURE PROPANE GAS PIPE SIZING "SECOND STAGE" (Based upon gas pressure of water. 3ODFHD´DOOHQKHDG...