User Guide
Page 2
... number of turns by 2, turn the Elevation plastic dial to zero. • Rotate the Elevation screw counter clock wise by the divided number of the splitter. • Connect the signal level meter [NB port to the [NB lock down . Tighten the tilt lock nuts down. • Change the meter to ... LNB to the IN port of the Single Port Power Pass Splitter. • Connect the SWM power inserter SWM power port to the DC OUT port of turns, tighten the Azimuth bolts down bolts. DIRECTV® SWM-ODU LNB Splitter Peaking Procedure For DIRECTV Model SL5S Do NOT connect any IRDs to prevent LNB...
... number of turns by 2, turn the Elevation plastic dial to zero. • Rotate the Elevation screw counter clock wise by the divided number of the splitter. • Connect the signal level meter [NB port to the [NB lock down . Tighten the tilt lock nuts down. • Change the meter to ... LNB to the IN port of the Single Port Power Pass Splitter. • Connect the SWM power inserter SWM power port to the DC OUT port of turns, tighten the Azimuth bolts down bolts. DIRECTV® SWM-ODU LNB Splitter Peaking Procedure For DIRECTV Model SL5S Do NOT connect any IRDs to prevent LNB...