Installation Guide
Page 40
... To predict and remedy strong EMI, you might be useful for planning the power distribution system needed to support the switches. Refer to consult RFI experts. When wires are run for a switch. Catalyst 4900 Series Switch Installation Guide 2-4 78-18039-02 Power Requirements and Heat Dissipation The power requirements might need to Appendix A, "Specifications," for...
... To predict and remedy strong EMI, you might be useful for planning the power distribution system needed to support the switches. Refer to consult RFI experts. When wires are run for a switch. Catalyst 4900 Series Switch Installation Guide 2-4 78-18039-02 Power Requirements and Heat Dissipation The power requirements might need to Appendix A, "Specifications," for...
Installation Guide
Page 46
... breaker size 5 Cable and interface equipment evaluation: Cable type Connector type Cable distance limitations Interface equipment (transceivers) 6 EMI evaluation: Distance limitations for signaling Site wiring RFI levels 2-10 Catalyst 4900 Series Switch Installation Guide 78-18039-02
... breaker size 5 Cable and interface equipment evaluation: Cable type Connector type Cable distance limitations Interface equipment (transceivers) 6 EMI evaluation: Distance limitations for signaling Site wiring RFI levels 2-10 Catalyst 4900 Series Switch Installation Guide 78-18039-02