Installation Guide
Page 7
... electric shock by CSA International for electric current. In the event of malfunction or breakdown, grounding will reduce the risk of least resistance for LP (propane or butane) gases with appropriate conversion. ■■Your dryer must be provided. If this dryer be made to convert the appliance from the gas...
... electric shock by CSA International for electric current. In the event of malfunction or breakdown, grounding will reduce the risk of least resistance for LP (propane or butane) gases with appropriate conversion. ■■Your dryer must be provided. If this dryer be made to convert the appliance from the gas...
Installation Guide
Page 8
... be installed within six (6) ft. (1.8 m) of the supply line is acceptable for each 1,000 ft. (305 m) increase in accordance with the B149.1, Natural Gas and Propane Installation Code. In Canada: An individual manual shut-off valve. †®TEFLON is required for lengths under 20 ft. (6.1 m) if local codes and gas...
... be installed within six (6) ft. (1.8 m) of the supply line is acceptable for each 1,000 ft. (305 m) increase in accordance with the B149.1, Natural Gas and Propane Installation Code. In Canada: An individual manual shut-off valve. †®TEFLON is required for lengths under 20 ft. (6.1 m) if local codes and gas...