PRO 48 Installation Guide
Page 12
... it is recommended that the first few batches of ice produced should be present in position, extend the front leveling legs down by turning the legs counterclockwise and adjust the height. PRO 48 Installation 12 Water Line Connection Approximately 3' (.9 m) of 1/4" plastic tubing is connected to the ice maker with a preassembled 1/4" compression connection at the end of...
... it is recommended that the first few batches of ice produced should be present in position, extend the front leveling legs down by turning the legs counterclockwise and adjust the height. PRO 48 Installation 12 Water Line Connection Approximately 3' (.9 m) of 1/4" plastic tubing is connected to the ice maker with a preassembled 1/4" compression connection at the end of...
PRO 48 Installation Guide
Page 17
Turn the unit on ? Is the control turned on . Is the water supply turned on and ice maker control on a solid, level floor? Are doors and drawers aligned for any installation or service problems been noted on the product registration card? ... is to ensure that no part of installation. Is the water supply line connected and not leaking? PRO 48 Installation Installation Checklist To ensure a safe and proper installation, the following checklist should be done by the installer to be completed by the authorized Sub-Zero dealer or installer with a reverse osmosis system)? Has the top...
Turn the unit on ? Is the control turned on . Is the water supply turned on and ice maker control on a solid, level floor? Are doors and drawers aligned for any installation or service problems been noted on the product registration card? ... is to ensure that no part of installation. Is the water supply line connected and not leaking? PRO 48 Installation Installation Checklist To ensure a safe and proper installation, the following checklist should be done by the installer to be completed by the authorized Sub-Zero dealer or installer with a reverse osmosis system)? Has the top...