Hardware Installation Guide
Page 25
... only to the Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 switches. Alternating green and amber1 Wireless controller is operating normally. OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 1-15 Table 1-1 System LED Color System Status Off System is not powered on page 2-7. For information on the System LED colors during power-on self-test (POST), see...
... only to the Catalyst 3750G-24WS-S25 and 3750G-24WS-S50 switches. Alternating green and amber1 Wireless controller is operating normally. OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 1-15 Table 1-1 System LED Color System Status Off System is not powered on page 2-7. For information on the System LED colors during power-on self-test (POST), see...
Hardware Installation Guide
Page 39
..., page 2-7 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 2-1 Switch Installation 2 C H A P T E R This chapter describes how to start your stack. Read the topics and perform the procedures in mind while planning your switch and how to interpret the power-on self-test (POST) that ensures proper operation...Cable to StackWise Ports, page 2-30 • Installing and Removing SFP Modules, page 2-33 • Installing and Removing XENPAK Modules (Catalyst 3750G-16TD Switch), page 2-35 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-39 • Connecting to an SFP ...
..., page 2-7 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 2-1 Switch Installation 2 C H A P T E R This chapter describes how to start your stack. Read the topics and perform the procedures in mind while planning your switch and how to interpret the power-on self-test (POST) that ensures proper operation...Cable to StackWise Ports, page 2-30 • Installing and Removing SFP Modules, page 2-33 • Installing and Removing XENPAK Modules (Catalyst 3750G-16TD Switch), page 2-35 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-39 • Connecting to an SFP ...
Hardware Installation Guide
Page 85
...) workstation. For a full description of the switch LEDs, see the "LEDs" section on self-test (POST), port-connectivity problems, and overall switch performance. See the software configuration guide and the switch command reference on Cisco.com or the documentation that came with your... topics: • "Verify Switch POST Results" section on page 3-2 • "Monitor Switch LEDs" section on page 3-2 • "Verify Switch Connections" section on page 3-2 • "Monitor Switch Performance" section on page 3-5 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 3-1 You can...
...) workstation. For a full description of the switch LEDs, see the "LEDs" section on self-test (POST), port-connectivity problems, and overall switch performance. See the software configuration guide and the switch command reference on Cisco.com or the documentation that came with your... topics: • "Verify Switch POST Results" section on page 3-2 • "Monitor Switch LEDs" section on page 3-2 • "Verify Switch Connections" section on page 3-2 • "Monitor Switch Performance" section on page 3-5 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 3-1 You can...
Hardware Installation Guide
Page 132
...self-test (POST), a series of tests that runs automatically to a grounded AC outlet. (Optional) If you have stacked your switches, see the "Powering Considerations" section on all the switches in the stack. POST lasts approximately 1 minute. Starting the Terminal Emulation Software Appendix D Configuring the Switch... Cisco redundant power system (RPS), see the output display from the power-on a switch rear panel. When the switch begins... that the switch functions properly. Note If you are using a PC or terminal. See Figure D-4. Catalyst 3750 Switch Hardware Installation ...
...self-test (POST), a series of tests that runs automatically to a grounded AC outlet. (Optional) If you have stacked your switches, see the "Powering Considerations" section on all the switches in the stack. POST lasts approximately 1 minute. Starting the Terminal Emulation Software Appendix D Configuring the Switch... Cisco redundant power system (RPS), see the output display from the power-on a switch rear panel. When the switch begins... that the switch functions properly. Note If you are using a PC or terminal. See Figure D-4. Catalyst 3750 Switch Hardware Installation ...