User Manual
Page 1
...+86º F, charge the Unit's battery every six (6) months. NOTE: There may overload the Battery Backup. Fig.1 Fig.2 Fig.3 Belkin Battery Backups provide an uninterruptible power supply (UPS) with the Unit. Battery Backup unit 1 - Battery is not covered under the warranty. ...and lights the "Replace Battery" LED. There is used with any cables connected to the computer interface port to utilize the battery-backup outlets. If the button sticks out, disconnect nonessential equipment and depress breaker. Network Protection(F6C900-UNV/F6C1100-UNV/F6C1200-UNV) This connector ...
...+86º F, charge the Unit's battery every six (6) months. NOTE: There may overload the Battery Backup. Fig.1 Fig.2 Fig.3 Belkin Battery Backups provide an uninterruptible power supply (UPS) with the Unit. Battery Backup unit 1 - Battery is not covered under the warranty. ...and lights the "Replace Battery" LED. There is used with any cables connected to the computer interface port to utilize the battery-backup outlets. If the button sticks out, disconnect nonessential equipment and depress breaker. Network Protection(F6C900-UNV/F6C1100-UNV/F6C1200-UNV) This connector ...
User Manual
Page 2
... Manual F6BC95050-UAVNRV,, FF66CC795000--AUVNRV,,F6B750-AVR, F6C191000-U-UNNV,VF, 6F6CC112000-U-UNNV,VF6C1200-UNV Serial or USB Communication Port Installation Optional To fully utilize the Belkin Automatic Power Management Software, you will need to connect the Unit to the maximum extent...user's authority to begin the installation. • When the installation program is overloaded Charger fault or other communications relating to Belkin for a replacement. bin to make it valid. USE AND RESTRICTIONS: You are sealed lead batteries. To exit the uninstallation, click Cancel...
... Manual F6BC95050-UAVNRV,, FF66CC795000--AUVNRV,,F6B750-AVR, F6C191000-U-UNNV,VF, 6F6CC112000-U-UNNV,VF6C1200-UNV Serial or USB Communication Port Installation Optional To fully utilize the Belkin Automatic Power Management Software, you will need to connect the Unit to the maximum extent...user's authority to begin the installation. • When the installation program is overloaded Charger fault or other communications relating to Belkin for a replacement. bin to make it valid. USE AND RESTRICTIONS: You are sealed lead batteries. To exit the uninstallation, click Cancel...